Reference No: PSG0095Pages: 10Published on: 4, November, 2004
Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More
Reference No: MAR0493(A)Pages: 14Published on: 13, October, 2017
Abstract: Case presents the reflections of Mr Deepak Kumar, Chairman and Managing Director of MakeMyTrip (MMT) about a meeting he had called for assessing the need and defining the problem for re-designing the home page of MMT, a leading on line travel organisation. The responsibilities and views of Heads of Technology, ... More
Reference No: PSG0103(D)Pages: 3Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: MAR0349Pages: 16Published on: 1, January, 2003
Abstract: This case is based on the real life experience of an emotionally traumatic incident, caused due to the poor servicing by Delta Airlines, and their travel agent. The post incident communication and the subsequent proceedings in the Consumer Court are discussed in the case. The case brings out interesting aspects ... More
Reference No: MAR0383Pages: 14Published on: 14, July, 2006
Abstract: Abstract The case describes locations, facilities, infrastructure, market, manpower, customer profile, competition and performance of one training and experimentation outlet. It also describes different types of experiments (operations, service, and customer related) conducted at the outlet. Outlet in-charge / sales officer is faced with the issues of deciding what research/ experiments ... More
Reference No: QM0107Pages: 12Published on: 1, January, 1976
Abstract: The case is mainly a transport problem. There are three factories delivering three product groups to twenty- three warehouses. The solution calls for an optimization of total costs for the company, taking into account the production constraints at each factory, the local demand, and the export needs. The data problems ... More
Reference No: F&A0262Pages: 20Published on: 1, January, 1975
Abstract: The introduction of corporate planning in Indian Railways, the largest public undertaking in country, has been described in detail. This case should be used jointly with the note Indian Railways [F&A0261], which highlights the operational characteristics of the Indian Railways and the problems faced in the planning process. ... More
Reference No: QM0211Pages: 5 Published on: 1, January, 1988
Abstract: The case depicts a maintenance planning and scheduling problem for the Caravelle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are described. The objective is to develop preventive maintenance schedules to ensure proper utilization of the available ... More
Reference No: F&A0481(D)Pages: 29Published on: 17, July, 2008
Abstract: Air Deccan planned to raise ` 450 crore by selling up to 26 per cent stake to professional investor(s). This was the consequence of a debt that needed to be paid. The situation was grim for Air Deccan. There were pending law suits and some of the top management executives were leaving ... More
Reference No: GRC0001Pages: 18Published on: 21, December, 2009
Abstract: Sexual harassment at workplace is often ignored. The reasons may the fear of being fired, singled out, discriminated, nitpicking, being burdened with avoidable work, etc. There may be another serious reason which is of unavailability of an efficacious, just, fair and reasonable legal remedy. While making a decision, the courts ... More
Reference No: PSG0072Pages: 30Published on: 28, October, 1996
Abstract: This case focuses on the future strategic directions required for the continued growth of PSPCL, a Thailand based tramp-shipping company. The company currently has 27 secondhand vessels, all in the handy size range. The company was considering the following strategic choices: a) Extent of fleet expansion, b) Should new builds be ... More
Reference No: CIIE0007Pages: 14Published on: 26, October, 2016
Abstract: This case describes a situation in which Malkit Singh Bal (Bal) partner of Bal Roadlines shares with Mr. Ghura, who was about to be hired as consultant for Bal Roadlines, about the rise in issue of fraud and crime done by the fleet drivers and asked him to help a ... More
Reference No: PSG0103(B)Pages: 26Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: MAR0173(B)Pages: 7 Published on: 1, January, 1976
Abstract: In 1966, Dunlop had commissioned a study to look into the media habits of truck drivers and owners who were primarily responsible for deciding on buying truck tyres. The idea was to arrive at a suitable media mix for the new theme of advertising to be launched by Dunlop in 1967. The ... More
Reference No: MAR0373(C)Pages: 4Published on: 3, September, 2006
Abstract: This case adds to the data presented in case titled, "Packers, Movers & Shakers (A)" (MAR0373) and "Packers, Movers & Shakers (B)" (MAR0374). A consumer was disappointed with the experience he had with a company that he had hired to pack and shift his household belongings from one city to another. An ... More