Filter By

Your search 'Logon Project' did not match any products.
Showing results using some of your search terms 'Logon Project'

Search results for 'Project'

per page
  1. Upgradation of the Pump Station Project Phase I in the Naharkatiya-Barauni Pipeline of Oil India Limited

    Authors: Dutta, Goutam;

    Reference No: PSG0135 Pages: 38 Published on: 9, February, 2021

    Abstract: Oil India Limited (OIL) wanted to replace pumps and generators in nine pumping stations located in three states of India—Bihar, West Bengal and Assam—with 1157-km-long pipelines. This case deals with several types of uncertainties and complexities faced by the project team: selection of pumps, monsoon (weather) problems, drawing ... More

  2. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  3. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  4. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  5. SYS Fertilizers (C): Project Management

    Authors: Shinde, Shubham A; Parameshwari, Yoga M; Narayanaswami, Sundaravalli ;

    Reference No: O&DS0007(C)EX Pages: 3 Published on: 6, January, 2025

    Abstract: Fertilizer. She is currently planning a critical shutdown in the nitric acid plant. The plant would incur a penalty anywhere between ₹10 to ₹15 lakh per hour for delays. Akshara should use the critical path method (CPM) in scheduling tasks and identify the critical path to decrease the overall time required for ... More

  6. Project Planning and Scheduling for Implementation

    Authors: Korgaonker, M G;

    Reference No: PROD0210TEC Pages: 25 Published on: 1, January, 1991

    Abstract: This note deals with planning and scheduling implementation of projects. It begins by considering the Work Breakdown Structure (WBS) of a project as a fundamental requirement for development of planning and scheduling systems. Various methods of structuring the WBS of projects are first discussed at length, including ways of establishing ... More

  7. Govind's Project on Rabbit Breeding and Shawl Making

    Authors: Gupta, G S;

    Reference No: ECO0329 Pages: 10 Published on: 1, January, 1992

    Abstract: The case is based on a project report prepared for the development of the Bhotia tribals (ST) of a rural place in Almora district, U.P. The project involves setting up of a unit, which will procure Rabbits and breed them for wool and make shawls for selling. The principle ... More

  8. Project Evaluation and Investment Decision: Jaya Pipes Limited

    Authors: Gupta, G S;

    Reference No: ECO0161 Pages: 11 Published on: 1, January, 1974

    Abstract: Jaya Pipes Limited was promoted in October 1960 by Mr. M L Agrawal to manufacture pipes, tubes, and other contrivances out of iron, steel and such other such materials. As steel scrap was relatively cheaper at the time of its inception the planet installed was suitable for the manufacturing scrap-based pipes. ... More

  9. ACC Limited: Project 30-30

    Authors: Mukherjee, Saral; Raghuram, G; Soman, Chetan;

    Reference No: PROD0295 Pages: 45 Published on: 2, September, 2011

    Abstract: ACC Limited, under Project 30-30, had targeted to produce and sell 30 million tons (mt) of cement in the year 2011. In May 2011, the Head of Central Logistics had found the target of the project to have become increasingly difficult to achieve. He believed that to sell 30 mt of cement, 30 mt had ... More

  10. Project Interactions: Use of the NPV Rule

    Authors: Pandey, I M;

    Reference No: F&A0369TEC Pages: 12 Published on: 1, January, 1985

    Abstract: This technical note shows application of the NPV rule under complicated investment situations. Specifically, it shows the use of the NPV rule in handling three types of investment problems: 1) projects with different lives; 2) investment timing; and 3) project replacement. ... More

  11. The Small Car Project **

    Authors: Paul, S;

    Reference No: ECO0018 Pages: 12 Published on: 1, January, 1966

    Abstract: The case Concerns the small car investment project about which the Government of India was to announce a decision in 1955. The problem was: In view of the existing idle capacity in the indigenous industry, and the foreign exchange shortage, was the decision to go ahead with a new Small car ... More

  12. Dredging Corporation of India

    Authors: Raghuram, G; Vohra, Neharika;

    Reference No: PSG0081 Pages: 24 Published on: 26, February, 2001

    Abstract: Dredging Corporation of India (DCI) catered to about 50 percent of the dredging requirements in India, most of which were at the major ports. This market share had dropped from a 95 percent level, over the past few years, due primarily to liberalization and ports moving away from a nomination basis to ... More

  13. Enercon India: Project Planning

    Authors: Mukherjee, Saral; Raghuram, G;

    Reference No: PROD0265 Pages: 32 Published on: 23, April, 2004

    Abstract: Enercon India Limited (EIL) is involved in setting up Wind Energy Converters (WECs) in several states of India. EIL offers customers a hassle free investment opportunity in the wind energy business through its "from concept to commissioning and beyond" strategy. In the backdrop of impressive growth, EIL is facing difficulties ... More

  14. Financing Seed Production Project **

    Authors: Desai, D K;

    Reference No: CMA0215 Pages: 8 Published on: 15, February, 1972

    Abstract: Having understood the importance of the new seed industry, the chairman of National Bank Limited was thinking of developing a project on hybrid seed production. In the meantime, the National Seed Corporation, which had undertaken hybrid seed production in Mysore State, approached the bank with a suggestion that the bank ... More