Search results for 'project ma'

per page
  1. The CAT Project

    Authors: Barua, Samir K;

    Reference No: PROD0306 Pages: 2 Published on: 22, April, 2015

    Abstract: The Case provides an opportunity to students to learn about the basic concepts in Project Management using a situation that can be easily understood by all. The case provides the instructor an opportunity to demonstrate to the students as to how precedence relationships are to be generated from assertions made ... More

  2. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (B)

    Authors: Dutta, Goutam; Sarkar, Debasis;

    Reference No: PSG0144(B) Pages: 17 Published on: 27, April, 2022

    Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More

  3. Pramukh Swami Maharaj Shatabdi Mahotsav: Design of a Mega Project

    Authors: Khadher, Rashid K; Mukherjee, Saral; Soman, Chetan;

    Reference No: O&DS0006 Pages: 21 Published on: 25, November, 2024

    Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More

  4. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  5. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  6. Dharavi Redevelopment Project: Strategy for Project Implementation

    Authors: Ravichandran, N; Patel, Nikunjkumar; Lawrence, Russel ;

    Reference No: STR0477 Pages: 16 Published on: 4, September, 2023

    Abstract: The case presents the complexities involved in implementing a social project with specific reference to Dharavi Redevelopment Project (DRP) in Bombay. This project was awarded to Adani Group, a large business conglomerate in India. The multiple stakeholders in DRP include politicians, bureaucrats, population living in Dharavi, the manufacturing companies which ... More

  7. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  8. Pradhan Mantri Gram Sadak Yojona Rural Road Construction Project Road No 216 (A)

    Authors: Dutta; Goutam;

    Reference No: PSG0129(A) Pages: 5 Published on: 30, July, 2018

    Abstract: S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used ... More

  9. Pradhan Mantri Gram Sadak Yojona Rural Road Construction Project Road No 216 (B)

    Authors: Dutta; Goutam;

    Reference No: PSG0129(B) Pages: 14 Published on: 30, July, 2018

    Abstract: S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used ... More

  10. Dadri Power Plant of National Thermal Power Corporation Limited

    Authors: Shukla, Ajay; Dutta, Goutam;

    Reference No: PROD0310 Pages: 29 Published on: 31, March, 2016

    Abstract: This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management , enforcement of safety rules , managing regulation iand in team building in leadership. A suitable case for ... More

  11. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  12. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (A)

    Authors: Dutta, Goutam; Sarkar, Debasis; Viswanath, Ashna;

    Reference No: PSG0144(A) Pages: 19 Published on: 27, April, 2022

    Abstract: The case discusses the situation of Mr. Madhavan, Managing Director of the Progressive Metro Rail Corporation, following the mayhem at the construction site of the metro. He has to submit a comprehensive risk management system to the Chief Minister and the cabinet ministers. Before developing a risk management system, it ... More

  13. Excercises on MS Project

    Authors: Rao, V Venkata;

    Reference No: CISG0095EX Pages: 5 Published on: 17, September, 2007

    Abstract: The excercises consist of seven problems related to the practice of the following features of MS Project package: 1) Project Tracking 2) Import and Export of project data 3) Resource Analysis 4) Linking of multiple projects. ... More

  14. Jindal Vijayanagar Steel Limited (A): Challenges of Installing Corex I Plant

    Authors: Dutta, Goutam;

    Reference No: QM0279(A) Pages: 18 Published on: 29, March, 2019

    Abstract: Mr. Sajjan Jindal, MD of JVSL (nos JSW) wanted to bring the latest technology of iron making into India. His project went to several cost overrun and time overrun due to several foreseen and unforessen circumstances. This case discusses the issues new technology introduction in iron making area, problem faced ... More

  15. Project Cost Control: Cost Estimating, Coding and Cost Accounting

    Authors: Shukla, P R;

    Reference No: PROD0189TEC Pages: 7 Published on: 1, January, 1984

    Abstract: Discusses the estimation of cost in project situations at various points in time. Also discusses coding to facilitate reporting and control of costs, and the cost accounting procedure for the project situation. ... More

Items 1 to 15 of 263

per page

My Cart

You have no items
in your shopping cart.