Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
  2. Remove This Item Sector: Government
Language
  1. English (12)
State
  1. Andhra Pradesh (1)
  2. Gujarat (6)
  3. Kerala (1)
  4. Madhya Pradesh (1)
  5. Maharashtra (1)
  6. West Bengal (1)
Product Type
  1. Case (12)
  2. Exercise (1)
  3. Technical Note (1)

Search results for 'project manag'

per page
  1. Project Management for Computerisation of Registration Sorting at Ahmedabad

    Authors: Raghuram, G; Jain, Rekha;

    Reference No: QM0240EX Pages: 10 Published on: 30, June, 1997

    Abstract: This case deals with the project management of computerization of registration sorting by the Department of Post in Ahmedabad. An assessment of activity times shows that the project would go beyond the deadline. The PERT/CPM network highlights activities for possible crashing. ... More

  2. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  3. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  4. e-Suvidha

    Authors: Biyani, Nagendra K;

    Reference No: PSG0110 Pages: 17 Published on: 15, March, 2010

    Abstract: The case is about an e-governance project taken up by the Department of Andhra Pradesh Municipal Administratition to roll out a comprehensive and uniform software programme across all urban local bodies in the state. The basic objectives for taking up the project were to upgrade urban management processes and to ... More

  5. Rural Health Project Jamkhed

    Authors: Subramanian, Ashok;

    Reference No: PSG0045 Pages: 16 Published on: 1, January, 1982

    Abstract: The case traces the evolution of a rural health project in a backward district. It describes the reasons for the project team's work in this field and identifies its activities and their interrelationships. Managerial responses in terms of charges that have taken place in the project over time are presented. ... More

  6. The Soil Health Card Project

    Authors: Vijaya Sherry Chand; Ravi, Jayanti S;

    Reference No: RJMC0022 Pages: 18 Published on: 13, June, 2012

    Abstract: The Commissionerate of Higher Education had motivated 55 science colleges to take up the Soil Health Card Project, a project of the Agriculture Department, under which 740,000 soil samples were tested in 2010. In 2011, there was a delay in obtaining approvals. The Commissionerate took some remedial steps and is about to obtain an ... More

  7. Mhow Ghatabillod Road

    Authors: Raghuram, G; Parikh, Nayan;

    Reference No: PSG0095 Pages: 10 Published on: 4, November, 2004

    Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More

  8. Indian Farmers' Fertilizer Cooperative Limited: Aonla Project and the HBJ Pipeline

    Authors: Shukla, P R; Tripathy, Arabinda; Thomas, P S;

    Reference No: PROD0195(A) Pages: 31 Published on: 1, January, 1985

    Abstract: In 1984, IFFCO was invited by the Government of India to establish a gas?based fertilizer plant on the Hazira? Bijyapur?Jagdishpur pipeline. The case describes the company's Aonla Project and the steps taken by IFFCO's project staff to implement it. Information about the pipeline project is also given along with ... More

  9. Pipavav Railway Corporation Limited (A)

    Authors: Raghuram, G; Len Varghese George; Nishant Thusoo; Satyam Shivam Sundarm;

    Reference No: CIPR0004(A) Pages: 36 Published on: 23, March, 2010

    Abstract: This case focuses on risk identification in the context of a railway Public Private Partnership (PPP) project. The perspective is that of a lender. The project was to provide broad gauge (BG) rail connectivity to Pipavav port from Surendranagar, over a distance of 265 kms. The case provides the salient features ... More

  10. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  11. Developing Urban Transport Infrastructure in Ahmedabad: The Bus Rapid Transit System (A)

    Authors: Gupta, Atul; Dabir, Bhushan; Patil, Sapana; Mahajan, Dilip; Swamy, Shivanand;

    Reference No: CIPR0001(A) Pages: 14 Published on: 1, December, 2006

    Abstract: The government has created an environment for rapid development to take place in infrastructure. However, managing the involvement of private partners as well as providing firm regulation requires institutions. Local governments at the city level have little experience in managing this process. This case uses the bus rapid transit system ... More

  12. Logical Framework Analysis

    Authors: Ramani, K V;

    Reference No: PSG0097TEC Pages: 5 Published on: 26, March, 2006

    Abstract: Logical Framework Analysis (LFA) was first formally adopted as a planning tool for overseas development activities by USAID in the early 1970s. Its origins can possibly be traced back to the private sector management concept of "Management by Objectives" approach of the 1960s. LFA has since been adopted and adapted ... More

  13. Cochin International Airport Limited (A)

    Authors: Varkkey, Biju; Raghuram, G;

    Reference No: PSG0098(A) Pages: 44 Published on: 5, April, 2006

    Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More

  14. Vadodara Halol Toll Road

    Authors: Raghuram, G;

    Reference No: PSG0091 Pages: 17 Published on: 24, September, 2003

    Abstract: The management of the Vadodara Halol Toll Road Company Limited (VHTRL) was worried about the toll revenues. The actual revenues as a proportion of the projected revenues had declined from 63 percent to 34 percent over the three financial years of operation. Given the cash flows, the VHTRL could run smoothly only ... More

per page

My Cart

You have no items
in your shopping cart.