Reference No: PSG0108Pages: 55Published on: 4, February, 2009
Abstract: The Vijayanagar plant of the JSW Steel Limited was all set for increasing its hot metal capacity from 3.8mtpa (million tons per annum) in 2008 to 6.8mtpa in early 2009, and to 9.8mtpa in April 2010. The case examines the inbound and outbound logistics at all the three stages with a focus on ... More
Reference No: PSG0105Pages: 56Published on: 22, October, 2008
Abstract: The Ghaziabad (GZB) goods shed was one of the top rail goods handling points in the National Capital Region (NCR). The growth was expected to be robust in the forthcoming years, since GZB and Noida were high growth districts in the Uttar Pradesh part of the NCR. GZB goods shed ... More
Reference No: PSG0104Pages: 18Published on: 23, June, 2008
Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More
Reference No: PSG0103(C)Pages: 10Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: PSG0103(B)Pages: 26Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: PSG0103(A)Pages: 48Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: PSG0101Pages: 26Published on: 23, February, 2007
Abstract: Rapid technological changes and convergence of media had made "triple play" (i.e. voice, video, and internet) available on a single channel. In India, traditionally the cable TV network provided TV services and telecom network provided telecom/internet services. While some telecom companies had upgraded their networks to provide for ... More
Reference No: PSG0098(A)Pages: 44Published on: 5, April, 2006
Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More
Reference No: PSG0095Pages: 10Published on: 4, November, 2004
Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More
Reference No: PSG0091Pages: 17Published on: 24, September, 2003
Abstract: The management of the Vadodara Halol Toll Road Company Limited (VHTRL) was worried about the toll revenues. The actual revenues as a proportion of the projected revenues had declined from 63 percent to 34 percent over the three financial years of operation. Given the cash flows, the VHTRL could run smoothly only ... More
Reference No: PSG0088Pages: 37Published on: 24, April, 2003
Abstract: This case is on China Post that, like India Post, operates in a developing country with a large population and vast distances. For China Post, the period of around 1998 was one of transformation, with reform being the only way to survive the challenge of changing times. On the threshold of ... More
Reference No: PSG0087Pages: 19Published on: 24, April, 2003
Abstract: Australia Post (AP) is faced with the issue of continuance of its monopoly status in the standard letter category, and the pressures of meeting social obligations, while ensuring profitability. This case looks into the organizational set up of AP, the different services offered by AP, and an idea of its ... More
Reference No: PSG0078Pages: 35Published on: 15, April, 1999
Abstract: Though philanthropic activities are age old, in recent times, private service institutions have been acknowledged, both, by the people and the state, for the service they render. However, the accountability of such institutions is yet to be explored, from a service point of view. Though it will not add directly ... More
Reference No: PSG0081Pages: 24Published on: 26, February, 2001
Abstract: Dredging Corporation of India (DCI) catered to about 50 percent of the dredging requirements in India, most of which were at the major ports. This market share had dropped from a 95 percent level, over the past few years, due primarily to liberalization and ports moving away from a nomination basis to ... More