Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
Category
  1. Finance (2)
Language
  1. English (97)
Sector
  1. Agriculture and Animal Husbandry (23)
  2. Banking Finance Insurance (BFI) (6)
  3. Cooperatives (9)
  4. Education (2)
  5. Government (37)
  6. Health (8)
  7. Infrastructure (15)
  8. Manufacturing (42)
  9. Mining (2)
  10. Miscellaneous (10)
  11. Public Sector (19)
  12. Telecom and Software (2)
  13. Trade (1)
  14. Transportation and Logistics (17)
State
  1. Andhra Pradesh (3)
  2. Assam (2)
  3. Bihar (4)
  4. Gujarat (18)
  5. Karnataka (1)
  6. Kerala (4)
  7. Madhya Pradesh (1)
  8. Maharashtra (11)
  9. Uttar Pradesh (7)
  10. West Bengal (1)
Product Type
  1. Case (105)
  2. Exercise (6)
  3. Technical Note (17)

Search results for 'project ma'

per page
  1. Project Management for Computerisation of Registration Sorting at Ahmedabad

    Authors: Raghuram, G; Jain, Rekha;

    Reference No: QM0240EX Pages: 10 Published on: 30, June, 1997

    Abstract: This case deals with the project management of computerization of registration sorting by the Department of Post in Ahmedabad. An assessment of activity times shows that the project would go beyond the deadline. The PERT/CPM network highlights activities for possible crashing. ... More

  2. Pramukh Swami Maharaj Shatabdi Mahotsav: Design of a Mega Project

    Authors: Khadher, Rashid K; Mukherjee, Saral; Soman, Chetan;

    Reference No: O&DS0006 Pages: 21 Published on: 25, November, 2024

    Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More

  3. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  4. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  5. Dharavi Redevelopment Project: Strategy for Project Implementation

    Authors: Ravichandran, N; Patel, Nikunjkumar; Lawrence, Russel ;

    Reference No: STR0477 Pages: 16 Published on: 4, September, 2023

    Abstract: The case presents the complexities involved in implementing a social project with specific reference to Dharavi Redevelopment Project (DRP) in Bombay. This project was awarded to Adani Group, a large business conglomerate in India. The multiple stakeholders in DRP include politicians, bureaucrats, population living in Dharavi, the manufacturing companies which ... More

  6. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  7. Dadri Power Plant of National Thermal Power Corporation Limited

    Authors: Shukla, Ajay; Dutta, Goutam;

    Reference No: PROD0310 Pages: 29 Published on: 31, March, 2016

    Abstract: This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management , enforcement of safety rules , managing regulation iand in team building in leadership. A suitable case for ... More

  8. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  9. Excercises on MS Project

    Authors: Rao, V Venkata;

    Reference No: CISG0095EX Pages: 5 Published on: 17, September, 2007

    Abstract: The excercises consist of seven problems related to the practice of the following features of MS Project package: 1) Project Tracking 2) Import and Export of project data 3) Resource Analysis 4) Linking of multiple projects. ... More

  10. Project Cost Control: Cost Estimating, Coding and Cost Accounting

    Authors: Shukla, P R;

    Reference No: PROD0189TEC Pages: 7 Published on: 1, January, 1984

    Abstract: Discusses the estimation of cost in project situations at various points in time. Also discusses coding to facilitate reporting and control of costs, and the cost accounting procedure for the project situation. ... More

  11. Kerala Agricultural Development Project (B): Special Agricultural Development Unit

    Authors: Desai, D K;

    Reference No: CMA0538(B) Pages: 62 Published on: 1, January, 1981

    Abstract: The case deals with the sub-project on small farm development with special reference to tree crop development (coconut and pepper). It goes into the details of the cost-benefit analysis of the sub-project and raises questions as to what impact the delay in the implementation of the project and changes in ... More

  12. ACC Limited: Project 30-30

    Authors: Mukherjee, Saral; Raghuram, G; Soman, Chetan;

    Reference No: PROD0295 Pages: 45 Published on: 2, September, 2011

    Abstract: ACC Limited, under Project 30-30, had targeted to produce and sell 30 million tons (mt) of cement in the year 2011. In May 2011, the Head of Central Logistics had found the target of the project to have become increasingly difficult to achieve. He believed that to sell 30 mt of cement, 30 mt had ... More

  13. Dredging Corporation of India

    Authors: Raghuram, G; Vohra, Neharika;

    Reference No: PSG0081 Pages: 24 Published on: 26, February, 2001

    Abstract: Dredging Corporation of India (DCI) catered to about 50 percent of the dredging requirements in India, most of which were at the major ports. This market share had dropped from a 95 percent level, over the past few years, due primarily to liberalization and ports moving away from a nomination basis to ... More

  14. SYS Fertilizers (C): Project Management

    Authors: Shinde, Shubham A; Parameshwari, Yoga M; Narayanaswami, Sundaravalli ;

    Reference No: O&DS0007(C)EX Pages: 3 Published on: 6, January, 2025

    Abstract: Fertilizer. She is currently planning a critical shutdown in the nitric acid plant. The plant would incur a penalty anywhere between ₹10 to ₹15 lakh per hour for delays. Akshara should use the critical path method (CPM) in scheduling tasks and identify the critical path to decrease the overall time required for ... More

Items 1 to 15 of 136

per page

My Cart

You have no items
in your shopping cart.