Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
  2. Remove This Item Language: English
Sector
  1. Agriculture and Animal Husbandry (7)
  2. Cooperatives (2)
  3. Education (2)
  4. Government (10)
  5. Health (2)
  6. Infrastructure (6)
  7. Manufacturing (22)
  8. Mining (2)
  9. Miscellaneous (1)
  10. Public Sector (11)
  11. Telecom and Software (1)
  12. Transportation and Logistics (5)
State
  1. Andhra Pradesh (2)
  2. Bihar (3)
  3. Gujarat (9)
  4. Kerala (1)
  5. Maharashtra (6)
  6. Uttar Pradesh (1)
  7. West Bengal (1)
Product Type
  1. Case (40)
  2. Exercise (2)
  3. Technical Note (2)

Search results for 'PROJECT MANAGEMENT'

per page
  1. Pramukh Swami Maharaj Shatabdi Mahotsav: Design of a Mega Project

    Authors: Khadher, Rashid K; Mukherjee, Saral; Soman, Chetan;

    Reference No: O&DS0006 Pages: 21 Published on: 25, November, 2024

    Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More

  2. SYS Fertilizers (C): Project Management

    Authors: Shinde, Shubham A; Parameshwari, Yoga M; Narayanaswami, Sundaravalli ;

    Reference No: O&DS0007(C)EX Pages: 3 Published on: 6, January, 2025

    Abstract: Fertilizer. She is currently planning a critical shutdown in the nitric acid plant. The plant would incur a penalty anywhere between ₹10 to ₹15 lakh per hour for delays. Akshara should use the critical path method (CPM) in scheduling tasks and identify the critical path to decrease the overall time required for ... More

  3. Dadri Power Plant of National Thermal Power Corporation Limited

    Authors: Shukla, Ajay; Dutta, Goutam;

    Reference No: PROD0310 Pages: 29 Published on: 31, March, 2016

    Abstract: This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management , enforcement of safety rules , managing regulation iand in team building in leadership. A suitable case for ... More

  4. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  5. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  6. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (C)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(C) Pages: 19 Published on: 22, March, 2021

    Abstract: This case deals with the project on establishing a rural piped water supply scheme in a village of Bihar. The Chief Engineer, Public Health Division, Patna, Bihar called his team members to have the fourth and final meeting to discuss the resource scheduling, materials management and the man-power requirements in ... More

  7. Jindal Vijayanagar Steel Limited (B): Installation of Corex-I and II

    Authors: Dutta, Goutam;

    Reference No: QM0279(B) Pages: 10 Published on: 29, March, 2019

    Abstract: COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods used by them. Their use of Microsoft Project in place of Primavera is interesting. Before this, India did not have expertise in COREX. The ... More

  8. e-Suvidha

    Authors: Biyani, Nagendra K;

    Reference No: PSG0110 Pages: 17 Published on: 15, March, 2010

    Abstract: The case is about an e-governance project taken up by the Department of Andhra Pradesh Municipal Administratition to roll out a comprehensive and uniform software programme across all urban local bodies in the state. The basic objectives for taking up the project were to upgrade urban management processes and to ... More

  9. Reinventing Project Management at Tata Steel (A): Implementation of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(A) Pages: 13 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  10. Reinventing Project Management at Tata Steel (B): Revamp of Blast Furnace F

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(B) Pages: 7 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  11. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(B) Pages: 20 Published on: 22, March, 2021

    Abstract: A week after the first meeting, the Chief Engineer, Public Health Division, Patna, Bihar wanted to have a second meeting to discuss the development of a network diagram. In this meeting, he requested all the stakeholders to attend the meeting and discussed how the network diagram can be developed with ... More

  12. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  13. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  14. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  15. Gujarat State Fertilizers Company Limited (B)

    Authors: Aggarwal, S C;

    Reference No: PROD0026(B) Pages: 6 Published on: 1, January, 1967

    Abstract: Outlines the detailed discussions that took place between the case writer and the PERT administrator of the company. It highlights the problems the company had to face in working with PERT and also the way it solved them. The administrator describes his reactions, attitudes and dealings with the company's supervisory ... More