Your search 'Logon Project' did not match any products.
Showing results using some of your search terms 'Logon Project'

Search results for 'Project'

per page
  1. Project Management for Computerisation of Registration Sorting at Ahmedabad

    Authors: Raghuram, G; Jain, Rekha;

    Reference No: QM0240EX Pages: 10 Published on: 30, June, 1997

    Abstract: This case deals with the project management of computerization of registration sorting by the Department of Post in Ahmedabad. An assessment of activity times shows that the project would go beyond the deadline. The PERT/CPM network highlights activities for possible crashing. ... More

  2. The CAT Project

    Authors: Barua, Samir K;

    Reference No: PROD0306 Pages: 2 Published on: 22, April, 2015

    Abstract: The Case provides an opportunity to students to learn about the basic concepts in Project Management using a situation that can be easily understood by all. The case provides the instructor an opportunity to demonstrate to the students as to how precedence relationships are to be generated from assertions made ... More

  3. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (B)

    Authors: Dutta, Goutam; Sarkar, Debasis;

    Reference No: PSG0144(B) Pages: 17 Published on: 27, April, 2022

    Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More

  4. Dharavi Redevelopment Project: Strategy for Project Implementation

    Authors: Ravichandran, N; Patel, Nikunjkumar; Lawrence, Russel ;

    Reference No: STR0477 Pages: 16 Published on: 4, September, 2023

    Abstract: The case presents the complexities involved in implementing a social project with specific reference to Dharavi Redevelopment Project (DRP) in Bombay. This project was awarded to Adani Group, a large business conglomerate in India. The multiple stakeholders in DRP include politicians, bureaucrats, population living in Dharavi, the manufacturing companies which ... More

  5. Upgradation of the Pump Station Project Phase I in the Naharkatiya-Barauni Pipeline of Oil India Limited

    Authors: Dutta, Goutam;

    Reference No: PSG0135 Pages: 38 Published on: 9, February, 2021

    Abstract: Oil India Limited (OIL) wanted to replace pumps and generators in nine pumping stations located in three states of India—Bihar, West Bengal and Assam—with 1157-km-long pipelines. This case deals with several types of uncertainties and complexities faced by the project team: selection of pumps, monsoon (weather) problems, drawing ... More

  6. Kerala Agricultural Development Project (B1): Special Agricultural Development unit - (SADU)

    Authors: Desai, D K;

    Reference No: CMA0584 Pages: 45 Published on: 1, January, 1983

    Abstract: This case pertains to project implementation and is a continuation of Kerala Agricultural Project (B) (CMA0539). It deals with the problems of implementation after mid-term appraisal. The Director of the Special Agricultural Development Unit is faced with the problem of assessing the impact on profitabilities of the project due to ... More

  7. Amadubi Rural Tourism Project: Development of Project Risk Management (A)

    Authors: Dutta, Goutam; Santra, Sumitro;

    Reference No: PSG0120(A) Pages: 18 Published on: 8, February, 2015

    Abstract: Rural Tourism is an important feature in development of emerging states in India. This case study, an UNDP funded project with ministry of Tourism, GOI, focuses the problem faced by a NGO in developing a rural tourism in Jharkhand in India for a decade. The management issues are feasibility and ... More

  8. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  9. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  10. Excercises on MS Project

    Authors: Rao, V Venkata;

    Reference No: CISG0095EX Pages: 5 Published on: 17, September, 2007

    Abstract: The excercises consist of seven problems related to the practice of the following features of MS Project package: 1) Project Tracking 2) Import and Export of project data 3) Resource Analysis 4) Linking of multiple projects. ... More

  11. Pramukh Swami Maharaj Shatabdi Mahotsav: Design of a Mega Project

    Authors: Khadher, Rashid K; Mukherjee, Saral; Soman, Chetan;

    Reference No: O&DS0006 Pages: 21 Published on: 25, November, 2024

    Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More

  12. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  13. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  14. SYS Fertilizers (C): Project Management

    Authors: Shinde, Shubham A; Parameshwari, Yoga M; Narayanaswami, Sundaravalli ;

    Reference No: O&DS0007(C)EX Pages: 3 Published on: 6, January, 2025

    Abstract: Fertilizer. She is currently planning a critical shutdown in the nitric acid plant. The plant would incur a penalty anywhere between ₹10 to ₹15 lakh per hour for delays. Akshara should use the critical path method (CPM) in scheduling tasks and identify the critical path to decrease the overall time required for ... More

  15. Pradhan Mantri Gram Sadak Yojona Rural Road Construction Project Road No 216 (A)

    Authors: Dutta; Goutam;

    Reference No: PSG0129(A) Pages: 5 Published on: 30, July, 2018

    Abstract: S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used ... More

Items 1 to 15 of 417

per page

My Cart

You have no items
in your shopping cart.