Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
Language
  1. English (47)
Sector
  1. Agriculture and Animal Husbandry (7)
  2. Banking Finance Insurance (BFI) (1)
  3. Cooperatives (3)
  4. Education (2)
  5. Government (11)
  6. Health (2)
  7. Infrastructure (6)
  8. Manufacturing (25)
  9. Mining (2)
  10. Miscellaneous (4)
  11. Public Sector (13)
  12. Telecom and Software (1)
  13. Transportation and Logistics (6)
State
  1. Andhra Pradesh (2)
  2. Bihar (3)
  3. Gujarat (10)
  4. Kerala (1)
  5. Maharashtra (6)
  6. Uttar Pradesh (1)
  7. West Bengal (1)
Product Type
  1. Case (46)
  2. Exercise (4)
  3. Technical Note (5)

Search results for 'PROJECT MANAGEMENT'

per page
  1. Project Management for Computerisation of Registration Sorting at Ahmedabad

    Authors: Raghuram, G; Jain, Rekha;

    Reference No: QM0240EX Pages: 10 Published on: 30, June, 1997

    Abstract: This case deals with the project management of computerization of registration sorting by the Department of Post in Ahmedabad. An assessment of activity times shows that the project would go beyond the deadline. The PERT/CPM network highlights activities for possible crashing. ... More

  2. Pramukh Swami Maharaj Shatabdi Mahotsav: Design of a Mega Project

    Authors: Khadher, Rashid K; Mukherjee, Saral; Soman, Chetan;

    Reference No: O&DS0006 Pages: 21 Published on: 25, November, 2024

    Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More

  3. SYS Fertilizers (C): Project Management

    Authors: Shinde, Shubham A; Parameshwari, Yoga M; Narayanaswami, Sundaravalli ;

    Reference No: O&DS0007(C)EX Pages: 3 Published on: 6, January, 2025

    Abstract: Fertilizer. She is currently planning a critical shutdown in the nitric acid plant. The plant would incur a penalty anywhere between ₹10 to ₹15 lakh per hour for delays. Akshara should use the critical path method (CPM) in scheduling tasks and identify the critical path to decrease the overall time required for ... More

  4. Dadri Power Plant of National Thermal Power Corporation Limited

    Authors: Shukla, Ajay; Dutta, Goutam;

    Reference No: PROD0310 Pages: 29 Published on: 31, March, 2016

    Abstract: This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management , enforcement of safety rules , managing regulation iand in team building in leadership. A suitable case for ... More

  5. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(B) Pages: 24 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  6. Single Block Method of Blast Furnace Revamping Project at JSW Steel Plant at Dolvi, Maharashtra, India (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0329(A) Pages: 20 Published on: 1, November, 2021

    Abstract: The case deals with several kinds of uncertainties that were involved when Jindal South West (JSW), the largest steep producer of India, carried out a project for the 'single block blast furnace technology' for their integrated steel plant at Dolvi, Maharashtra. The company engaged in executing this mass operation which ... More

  7. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (C)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(C) Pages: 19 Published on: 22, March, 2021

    Abstract: This case deals with the project on establishing a rural piped water supply scheme in a village of Bihar. The Chief Engineer, Public Health Division, Patna, Bihar called his team members to have the fourth and final meeting to discuss the resource scheduling, materials management and the man-power requirements in ... More

  8. Jindal Vijayanagar Steel Limited (B): Installation of Corex-I and II

    Authors: Dutta, Goutam;

    Reference No: QM0279(B) Pages: 10 Published on: 29, March, 2019

    Abstract: COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods used by them. Their use of Microsoft Project in place of Primavera is interesting. Before this, India did not have expertise in COREX. The ... More

  9. e-Suvidha

    Authors: Biyani, Nagendra K;

    Reference No: PSG0110 Pages: 17 Published on: 15, March, 2010

    Abstract: The case is about an e-governance project taken up by the Department of Andhra Pradesh Municipal Administratition to roll out a comprehensive and uniform software programme across all urban local bodies in the state. The basic objectives for taking up the project were to upgrade urban management processes and to ... More

  10. Reinventing Project Management at Tata Steel (A): Caselet Implementaetion of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0273 Pages: 2 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in TATA STEEL becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  11. Reinventing Project Management at Tata Steel (A): Implementation of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(A) Pages: 13 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  12. Reinventing Project Management at Tata Steel (B): Revamp of Blast Furnace F

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(B) Pages: 7 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  13. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(B) Pages: 20 Published on: 22, March, 2021

    Abstract: A week after the first meeting, the Chief Engineer, Public Health Division, Patna, Bihar wanted to have a second meeting to discuss the development of a network diagram. In this meeting, he requested all the stakeholders to attend the meeting and discussed how the network diagram can be developed with ... More

  14. Dredging Corporation of India

    Authors: Raghuram, G; Vohra, Neharika;

    Reference No: PSG0081 Pages: 24 Published on: 26, February, 2001

    Abstract: Dredging Corporation of India (DCI) catered to about 50 percent of the dredging requirements in India, most of which were at the major ports. This market share had dropped from a 95 percent level, over the past few years, due primarily to liberalization and ports moving away from a nomination basis to ... More

Items 1 to 15 of 58

per page

My Cart

You have no items
in your shopping cart.