Reference No: QM0122TECPages: 4Published on: 1, January, 1977
Abstract: Describes the problem of sorting files that are too large to be resident in the main memory of a system with random-access devices. Drum sorting is analyzed first. The complication in analysis due to significant seek times is explained. A simplified situation where transfer and compute times are small is ... More
Reference No: PROD0134TECPages: 1 Published on: 1, January, 1977
Abstract: Illustrates the use of the multiple activity chart for balancing the activities of multiple machines. The example involves dumpers and a shovel used in the construction of a parking lot. The chart is similarly useful for balancing the activities of multiple men and machines in a man?machine operating system. ... More
Reference No: MAR0165Pages: 14 Published on: 1, January, 1977
Abstract: Describes the experience of a consumer who buys a toaster, covering prepurchase, purchase decision and postpurchase stages. The problems of consumers in buying and using a product as well as getting aftersales service are illustrated. The case brings out several issues concerning the protection of consumer interests ... More
Reference No: F&A0087Pages: 3 Published on: 1, January, 1977
Abstract: This is a case in comprehensive variance analysis. Requires computation of material, labour, and variable and fixed overheads in a process-costing situation. Variances have to be worked out on equivalent units of production rather than on just finished goods. ... More
Reference No: F&A0312(B)Pages: 3Published on: 1, January, 1977
Abstract: Gives additional information on losses to correct the accounting treatment followed in Case (A), where losses are ignored. Introduces the concepts of standard loss, abnormal loss, and abnormal gain. Excludes treatment of opening work-in-process. ... More
Reference No: P&IR0072(B)Pages: 7Published on: 1, January, 1977
Abstract: This case deals with the problems of manpower planning for workers' category in TELCO, Poona. It gives the steps followed by the Manpower Planning Cell between 1969-73 up to the stage of submission of Manpower Planning Proposal No.2. This proposal identifies the phased needs for manpower, locates alternative sources for ... More
Reference No: PROD0129TECPages: 12Published on: 1, January, 1977
Abstract: This note deals with incentives computation and the evaluation of the incentive scheme used in a firm manufacturing industrial explosives. The individual scheme used is the "work reward scheme" and the group scheme used is the "multifactor work reward scheme." In a situation where output is predominantly process?controlled, the ... More
Reference No: QM0104Pages: 8Published on: 1, January, 1977
Abstract: Deals with the problem of establishing the aggregate production capacity of a small ceramics shop which manufactures a variety of ceramic articles. The case describes the production process, including the equipment used, and details of the various products manufactured (such as the number of articles per set, sizes, weights, number ... More
Reference No: MAR0162Pages: 11Published on: 1, January, 1977
Abstract: The last quarter of 1976 saw a price war breaking out in the electronic calculator industry. The case focuses on the pricing decisions faced by a new fictitious firm planning to enter the electronic calculator market. ... More
Reference No: QM0130Pages: 9Published on: 1, January, 1977
Abstract: Deals with problems in statistical quality control, especially process control and acceptance sampling, in a large engineering company. ... More