Reference No: PSG0144(B)Pages: 17Published on: 27, April, 2022
Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More
Reference No: STR0477Pages: 16Published on: 4, September, 2023
Abstract: The case presents the complexities involved in implementing a social project with specific reference to Dharavi Redevelopment Project (DRP) in Bombay. This project was awarded to Adani Group, a large business conglomerate in India. The multiple stakeholders in DRP include politicians, bureaucrats, population living in Dharavi, the manufacturing companies which ... More
Reference No: PSG0144(A)Pages: 19Published on: 27, April, 2022
Abstract: The case discusses the situation of Mr. Madhavan, Managing Director of the Progressive Metro Rail Corporation, following the mayhem at the construction site of the metro. He has to submit a comprehensive risk management system to the Chief Minister and the cabinet ministers. Before developing a risk management system, it ... More
Reference No: ECO0018Pages: 12Published on: 1, January, 1966
Abstract: The case Concerns the small car investment project about which the Government of India was to announce a decision in 1955. The problem was: In view of the existing idle capacity in the indigenous industry, and the foreign exchange shortage, was the decision to go ahead with a new Small car ... More
Reference No: F&A0527Pages: 38Published on: 18, January, 2016
Abstract: Greenko is a renewable power generating company investing in biomass, small and medium hydro power and wind power projects. It was projected to achieve 1GW (Giga Watt=1000 Mega Watt) of installed capacity by March 2015. The company has been financing its projects with debt from Indian banks and financial institutions on ... More
Reference No: ECO0161Pages: 11 Published on: 1, January, 1974
Abstract: Jaya Pipes Limited was promoted in October 1960 by Mr. M L Agrawal to manufacture pipes, tubes, and other contrivances out of iron, steel and such other such materials. As steel scrap was relatively cheaper at the time of its inception the planet installed was suitable for the manufacturing scrap-based pipes. ... More
Reference No: QM0279(B)Pages: 10Published on: 29, March, 2019
Abstract: COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods used by them. Their use of Microsoft Project in place of Primavera is interesting. Before this, India did not have expertise in COREX. The ... More
Reference No: PSG0132Pages: 8Published on: 18, March, 2020
Abstract: The government is considering a semi high-speed rail project to tackle some of the current issues associated with the public transportation system in the proposed area. Given the hilly terrain of the area, the current means of transportation are very slow and unreliable. Several studies had shown that the lack ... More
Reference No: PSG0103(C)Pages: 10Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: PSG0103(D)Pages: 3Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: F&A0438EXPages: 25Published on: 15, April, 1997
Abstract: This case describes the planning, construction, financing and operation of the first toll road project in India by IL&FS in collaboration with the Madhya Pradesh State Industrial Development Corporation (MPSIDC) and its regional subsidiary Madhya Pradesh Audhyogik Kendra Vikas Nigam (Indore) Limited (MPAKVN). After initial operations, the project is ... More
Reference No: PSG0103(A)Pages: 48Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: ECO0350(B)Pages: 26Published on: 26, December, 2006
Abstract: This case follows case (A) which discusses NTPC's response to the Simhadri project that created a record of sorts in timely implementation of large projects and within a tight budget NTPC's record of 39 months for a green-field project in India. That has taken project implementation in India to international standards. ... More
Reference No: PSG0103(B)Pages: 26Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: ECO0350(A)Pages: 9Published on: 26, December, 2006
Abstract: The Indian electricity sector was opened to the private sector under the IPP policy. The NTPC, India's largest and perhaps most efficient generator had to respond to the changing scenario. It set out to set up the Simhadri project in Andhra Pradesh, going beyond to original mandate. The IPP policy, ... More