Search results for 'project ma'

per page
  1. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  2. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  3. Auto Care Centre: Shivranjini

    Authors: Jain, Abhinandan K; Dixit, M R; Bhat, Ramesh; Maheshwari, Sunil Kumar;

    Reference No: MAR0383 Pages: 14 Published on: 14, July, 2006

    Abstract: Abstract The case describes locations, facilities, infrastructure, market, manpower, customer profile, competition and performance of one training and experimentation outlet. It also describes different types of experiments (operations, service, and customer related) conducted at the outlet. Outlet in-charge / sales officer is faced with the issues of deciding what research/ experiments ... More

  4. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  5. Mhow Ghatabillod Road

    Authors: Raghuram, G; Parikh, Nayan;

    Reference No: PSG0095 Pages: 10 Published on: 4, November, 2004

    Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More

  6. Urabian Airbus Project

    Authors: Balakrishnan, K;

    Reference No: QM0111 Pages: 12 Published on: 1, January, 1976

    Abstract: Deals with the problems associated with the introduction of five widebody Airbuses to replace a fleet of Turbo Props and Caravelles. As it is essential to synchronize the publicity campaign with the formal introduction of the Airbus, the management wants to know when the five aircraft will be ready ... More

  7. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  8. Simha Airlines: Aircraft Maintenance Scheduling

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0208 Pages: 11 Published on: 1, January, 1987

    Abstract: The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time taken for project completion. Most of the activities have single time estimates, while a few activities have three time estimates. ... More

  9. Indian Railways: Freight Operations Information System

    Authors: Jain, Rekha; Raghuram, G;

    Reference No: QM0230 Pages: 44 Published on: 1, January, 1992

    Abstract: This case describes the project identification formulation and implementation aspects of the computer based freight Operations Information System (OIS) being planned on Indian Railways (IR). This system is expected to bring about improved efficiency through modernization in information handling and decision-making processes, as well as a qualitative change in the ... More

  10. Konkan Railway Corporation Limited

    Authors: Banerjee, Bibek; Raghuram, G; Rangaraj, Narayan;

    Reference No: MAR0321 Pages: 29 Published on: 3, May, 1999

    Abstract: Konkan Railway Corporation Limited (KRC) was set up as a Public Sector company under the Ministry of Railways in July 1990 to bridge the 738 km "Konkan Gap" by providing a railway connection between Roha (150 kms South of Mumbai) and Thokur (about 22 kms North of Mangalore). KRC completed the project at a ... More

  11. Vizag Port Traffic Study

    Authors: Ramani, K V; Mishra, Gouri Shankar;

    Reference No: CISG0065 Pages: 3 Published on: 16, April, 2001

    Abstract: GSM Private Limited is commissioning a port equipment system at the outer ore berth at Vishakapatnam (Vizag) port, designed to handle import of bulk commodities like cooking coal, fertilizers, and fertilizer raw materials. The project aims to deliver substantial benefits through economies of scale, resulting from the port's ability to ... More

  12. Southern Railway: Publication of a Customer Oriented Timetable

    Authors: Raghuram, G;

    Reference No: PSG0080EX Pages: 26 Published on: 24, November, 2000

    Abstract: In 1998, the Southern Railway (SR) undertook a project to qualitatively upgrade its railway timetable, with the objective of making it more user-friendly. The outcome of this effort, which resulted in the publication of a significantly improved version of the timetable in August 1998, had a dramatic impact in how it was ... More

  13. The Kandla-Bhatinda Pipeline Controversy

    Authors: Manikutty, S; Raghuram, G;

    Reference No: PSG0067 Pages: 27 Published on: 23, February, 1994

    Abstract: This case emphasizes the decision making process of infrastructure investments for the two modes of transportation of petroleum products between Kandla Port and North West India. Indian Oil Corporation made a proposal in 1981 for a new pipeline between Kandla and Bhatinda, in order to cater to the increased projected traffic ... More

  14. Hyderabad Metro Rail Limited

    Authors: Biyani, Nagendra; Raghuram, G;

    Reference No: CIPR0005 Pages: 30 Published on: 26, April, 2010

    Abstract: This case focuses on the way forward for Hyderbad Metro Rail Ltd (HMRL) as of July 2009, when the earlier winning bidder had to be served with a termination notice due to non compliance towards financial closure. The top management of HMRL was considering various alternatives before them: 1) Whether the second ... More

  15. Cochin International Airport Limited (A)

    Authors: Varkkey, Biju; Raghuram, G;

    Reference No: PSG0098(A) Pages: 44 Published on: 5, April, 2006

    Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More