Reference No: MAR0319(A)Pages: 28Published on: 30, October, 1998
Abstract: The case presents a review of the marketing strategy by its Ahmedabad based Ashima Attires (AA) for recently launched ready to stitch (RTS) shirting and trouser fabric brand called Icon. The focus is on the product offer, promotion, pricing, distribution, retailing, and logistics for the success of Icon. The company ... More
Reference No: BP0282(B)Pages: 12Published on: 2, December, 2002
Abstract: This case describes the initiatives of Ramkumar who took over as the Vice President of TI Cycles, and the corporate management of Tube Investments of India Limited to turn around the organization and create a platform for future growth. The protagonist Ramkumar is expected to review the performance and decide ... More
Reference No: O&DS0007(A)EXPages: 3Published on: 6, January, 2025
Abstract: This case revolves around SYS Fertilizers, an established agribusiness firm, that faced a capacity dilemma in its nitric acid production line. The company received an offer to export an additional 70 metric ton (MT) of concentrated nitric acid (CNA) daily, but this new demand would exceed their current production capacity. The ... More
Reference No: OB0196(C)Pages: 5Published on: 16, January, 2006
Abstract: The case adds to the data presented in cases "Midnight Flight (A)" and "Midnight Flight (B)". A couple was denied boarding a flight for which they had confirmed booking. They had to travel onwards by a train to reach their destination. Now their entire schedule was in a mess as ... More
Reference No: PSG0055Pages: 20 Published on: 1, January, 1989
Abstract: This case describes the organizational form and structure of passenger road transport undertakings in Tamil Nadu. Since nationalization in 1971, major decisions regarding the organizational form were taken. Road transport undertakings were set up in Tamil Nadu under the Companies Act, which is supposed to be RTC Act (which was the ... More
Reference No: PSG0103(A)Pages: 48Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: QM0279(B)Pages: 10Published on: 29, March, 2019
Abstract: COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods used by them. Their use of Microsoft Project in place of Primavera is interesting. Before this, India did not have expertise in COREX. The ... More
Reference No: BP0069(C)Pages: 12Published on: 1, January, 1976
Abstract: Presents the problems the authorized controller faced in running a unit after taking over the company under the Industries Act. The case is particularly useful in focusing or reestablishing the relations with foreign collaborators and suppliers for turning the company around. ... More
Reference No: PROD0327(B)Pages: 20Published on: 22, March, 2021
Abstract: A week after the first meeting, the Chief Engineer, Public Health Division, Patna, Bihar wanted to have a second meeting to discuss the development of a network diagram. In this meeting, he requested all the stakeholders to attend the meeting and discussed how the network diagram can be developed with ... More
Reference No: QM0230Pages: 44Published on: 1, January, 1992
Abstract: This case describes the project identification formulation and implementation aspects of the computer based freight Operations Information System (OIS) being planned on Indian Railways (IR). This system is expected to bring about improved efficiency through modernization in information handling and decision-making processes, as well as a qualitative change in the ... More
Reference No: CMA0571(B)Pages: 23Published on: 1, January, 1983
Abstract: The case is a continuation of Case (A). It explains the levels of decision-making, concerns at each level, and information flows. It raises the issues of management of information flows. ... More
Reference No: PSG0013TECPages: 8Published on: 1, January, 1979
Abstract: Saraspur PHC, under the control of the District Health Officer
(DHO), was showing poor performance in all programmes.
Moreover, its performance was deteriorating every month. This
surprised the DHO, for so far Saraspur had registered average
performance. Recently, it had been taken over by the regional
training centre as a ... More
Reference No: PROD0228(D)Pages: 15Published on: 1, January, 1995
Abstract: This case deals with the despatch policy of Lotus Thread Company Limited (LTCL). It focuses on the optimum shipment size and routing decisions. It examines the effect of smaller shipment and/or combining shipments and single/multiple destination despatches. Decisions in this regard is very critical as supply to different ... More
Reference No: QM0137(B)Pages: 22Published on: 1, January, 1978
Abstract: Describes information requirements and reporting formats for the situation described in Case (A) QM0137(A). The rationale for some reports is discussed, and some changes in documents and their flows are suggested. The computer configuration available for implementing the new system is provided for a detailed design of the new ... More
Reference No: F&A0325Pages: 4Published on: 1, January, 1979
Abstract: Narrates the discussion between the managing director and the chief accountant of a forest development corporation regarding the commencement of a boat-building yard. It gives a detailed breakup of the price and cost structure of a typical 48-feet teakwood- based boat they intend to manufacture as an ongoing activity. Students ... More