Filter By

Currently Shopping by:

  1. Remove This Item Discipline: IT and Systems
Language
  1. English (17)
Sector
  1. Agriculture and Animal Husbandry (1)
  2. Banking Finance Insurance (BFI) (1)
  3. Government (5)
  4. Manufacturing (2)
  5. Miscellaneous (7)
  6. Public Sector (3)
  7. Telecom and Software (2)
  8. Transportation and Logistics (3)
State
  1. Andhra Pradesh (1)
  2. Gujarat (2)
  3. Madhya Pradesh (1)
Product Type
  1. Case (15)
  2. Exercise (3)
  3. Technical Note (4)

Search results for 'Project manage'

per page
  1. Project Management for Computerisation of Registration Sorting at Ahmedabad

    Authors: Raghuram, G; Jain, Rekha;

    Reference No: QM0240EX Pages: 10 Published on: 30, June, 1997

    Abstract: This case deals with the project management of computerization of registration sorting by the Department of Post in Ahmedabad. An assessment of activity times shows that the project would go beyond the deadline. The PERT/CPM network highlights activities for possible crashing. ... More

  2. Excercises on MS Project

    Authors: Rao, V Venkata;

    Reference No: CISG0095EX Pages: 5 Published on: 17, September, 2007

    Abstract: The excercises consist of seven problems related to the practice of the following features of MS Project package: 1) Project Tracking 2) Import and Export of project data 3) Resource Analysis 4) Linking of multiple projects. ... More

  3. e-Suvidha

    Authors: Biyani, Nagendra K;

    Reference No: PSG0110 Pages: 17 Published on: 15, March, 2010

    Abstract: The case is about an e-governance project taken up by the Department of Andhra Pradesh Municipal Administratition to roll out a comprehensive and uniform software programme across all urban local bodies in the state. The basic objectives for taking up the project were to upgrade urban management processes and to ... More

  4. Thana Zilla Cooperative Fisheries Project (B)

    Authors: Gupta, V K;

    Reference No: CMA0599(B) Pages: 26 Published on: 1, January, 1984

    Abstract: Deals with the management problem of developing an information system to regulate the work of the fisheries project for its speedy completion. ... More

  5. Pipavav Railway Corporation Limited (A)

    Authors: Raghuram, G; Len Varghese George; Nishant Thusoo; Satyam Shivam Sundarm;

    Reference No: CIPR0004(A) Pages: 36 Published on: 23, March, 2010

    Abstract: This case focuses on risk identification in the context of a railway Public Private Partnership (PPP) project. The perspective is that of a lender. The project was to provide broad gauge (BG) rail connectivity to Pipavav port from Surendranagar, over a distance of 265 kms. The case provides the salient features ... More

  6. End User Computing in Shipping

    Authors: Rao, V Venkata;

    Reference No: CISG0029TEC Pages: 19 Published on: 18, April, 1995

    Abstract: This note summarizes the features of the following end user computing packages: 1. Spreadsheet Packages, 2. Data Management Packages, 3. Project Management Packages, 4. Presentation Software, 5. Computer-Aided Design, and 6. Multi-media Systems. In each category, wherever applicable, applications and new trends are also discussed. There is a section at the end that discusses the problems ... More

  7. Migration of Oracle Applications from 11.0.3 to 11i at JDS Universal

    Authors: Padalkar, Milind; Jain, Abhinandan K; Rao, V Venkata;

    Reference No: CISG0102 Pages: 24 Published on: 18, March, 2009

    Abstract: A project may fail because of several causes. A rigorous root cause analysis is required before the failure in addressed. In this case, the low delivery rate in a symptom and the root comes are not the people themselves, out the way the working environment in shaped by the Project ... More

  8. Choice of Methodology for Software Solution at ABC Inc.

    Authors: Sinha, Piyush Kumar; Raghuram, G;

    Reference No: CISG0079 Pages: 19 Published on: 5, September, 2003

    Abstract: In April 2001 Canto Systems embarked on a project to deliver a comprehensive integrated system that would cater to magazine company, ABC Inc.s, order processing, accounting and operational needs. CSL chose the " Waterfall Methodology " to develop the system that would have a phased approach with intermediate deliverables. One month into ... More

  9. Data Problems in Management of Agriculture **

    Authors: Sambrani, Shreekant;

    Reference No: CMA0380TEC Pages: 8 Published on: 31, December, 1975

    Abstract: The note discusses the need for monitoring performance in the execution of a project, based upon the project logic. Problems of obtaining processing using relevant data are discussed. ... More

  10. Indian Railways: Freight Operations Information System

    Authors: Jain, Rekha; Raghuram, G;

    Reference No: QM0230 Pages: 44 Published on: 1, January, 1992

    Abstract: This case describes the project identification formulation and implementation aspects of the computer based freight Operations Information System (OIS) being planned on Indian Railways (IR). This system is expected to bring about improved efficiency through modernization in information handling and decision-making processes, as well as a qualitative change in the ... More

  11. Police IT Ecosystem of Karnataka State Police

    Authors: Maheshwari, Sunil K; Verma, Sanjay; Ray, Prantika;

    Reference No: HRM0243 Pages: 9 Published on: 22, April, 2019

    Abstract: Sanjay Sahay, Additional Director General of Karnataka Police and the mastermind behind the fully operational IT ecosystem for Karnataka police reviewed the challenges and bottlenecks in the implementation of the system. He pondered upon the next steps in the direction of national implementation of the technology and his future career ... More

  12. Risk Assessment of the Traffic Accounting System at AHAAN Telecommunications Limited

    Authors: Jain, Rekha; Raghuram, G;

    Reference No: CISG0078 Pages: 18 Published on: 5, September, 2003

    Abstract: In August 1999, Canto Systems Limited (CSL) won a contract to provide AHAAN Telecommunications Limited (ATL) with an integrated solution to cater to its building and accounting requirements. CSL partnered with various companies to provide the four modules that constituted the project within seven months of signing the contract. Neither did ... More

Items 1 to 15 of 23

per page

My Cart

You have no items
in your shopping cart.