  1. What Time Core

    Authors: Korgaonker, M G;

    Reference No: PROD0133TEC Pages: 2 Published on: 1, January, 1977

    Abstract: Deals with the use of the time study technique for setting up time standards of repetitive and reasonably short?cycle operations. The specific operation in question is a core?making operation in a foundry. ... More

  2. Dumpers Build Parking Lot

    Authors: Korgaonker, M G;

    Reference No: PROD0134TEC Pages: 1 Published on: 1, January, 1977

    Abstract: Illustrates the use of the multiple activity chart for balancing the activities of multiple machines. The example involves dumpers and a shovel used in the construction of a parking lot. The chart is similarly useful for balancing the activities of multiple men and machines in a man?machine operating system. ... More

  3. Machines are Interacting

    Authors: Korgaonker, M G;

    Reference No: PROD0135TEC Pages: 1 Published on: 1, January, 1977

    Abstract: This is a note dealing with the interaction between man and machine in a man?machine system. The productivity of such a system is primarily determined by the time required to complete a full cycle of operations. In order to improve the productivity of such a system, recording the cycle ... More

  4. Work Sytems - Case of Post Offices

    Authors: Korgaonker, M G;

    Reference No: PROD0136TEC Pages: 7 Published on: 1, January, 1977

    Abstract: This note deals with the design of work systems in post offices to understand the transformation process underlying the operating system. The note focuses on the tasks, flows and storages in the operating systems of post offices, and how work systems can be suitably designed taking into account the volume ... More

  5. What is in Productivity

    Authors: Korgaonker, M G;

    Reference No: PROD0140TEC Pages: 2 Published on: 1, January, 1977

    Abstract: The note deals with problems of measurement of productivity at the firm level and aims at evolving possible methods for its measurement. The method actively considered involves the measurement of value added output and all inputs. ... More

  6. Hindustan Engineering Company Limited

    Authors: Korgaonker, M G;

    Reference No: PROD0141 Pages: 3 Published on: 1, January, 1978

    Abstract: Deals with the setting up of suitable incentives in a machine shop. It focuses on long? and short?term problems involved in adopting either individual or group incentive schemes in such shops. ... More

  7. Indian Equipment Company (A)

    Authors: Korgaonker, M G;

    Reference No: PROD0144(A) Pages: 3 Published on: 1, January, 1978

    Abstract: Deals with the evaluation of the total productivity effort of the shop management. It refers to the standard products division of a large public limited company. The case looks at the total productivity improvement programme of the company in a historical perspective and then evaluates in quantitative terms the contribution ... More

  8. Integrated Maintenance Management

    Authors: Korgaonker, M G;

    Reference No: PROD0145TEC Pages: 17 Published on: 1, January, 1978

    Abstract: This note deals with the important aspects of integrated maintenance management. Issues discussed relates to: 1) for management: role and organizational structure; 2) for/in maintenance: strategy formulation and action plan; 3) planning, allocation, scheduling and control of resources; 4) design and implementation of information system; 5) inspection and test procedures; 6) control of cost; and 7) ... More

  9. A Branch and Bound Approach to Job Shop Scheduling Problem

    Authors: Korgaonker, M G;

    Reference No: PROD0146TEC Pages: 7 Published on: 1, January, 1979

    Abstract: Deals with the branch and bound approach to solving general flow shop and job shop scheduling problems in the deterministic case. The three?machine flow shop problem is considered first; the approach is then extended to multi?machine flow shop problem. A branch and bound approach is provided for job ... More

  10. Scheduling

    Authors: Korgaonker, M G;

    Reference No: PROD0147TEC Pages: 21 Published on: 1, January, 1979

    Abstract: Discusses various aspects of the scheduling function. Discusses the basic structure, basic technology, and types of models relating to scheduling. The problem is then formulated in quantitative terms and Gantt chart representation is given. Various assumptions made in the analysis of scheduling problems are critically reviewed and measures of performance ... More

  11. Production Planning in Batch Production Systems

    Authors: Korgaonker, M G;

    Reference No: PROD0148TEC Pages: 26 Published on: 1, January, 1979

    Abstract: This note discusses the method of scheduling batches in intermittent production systems. The production systems covered are single machine and multiple machines. Problems of scheduling multiple products are also considered. Computational details are provided for time invariant as well as dynamic batch sizes. ... More

  12. The Reaction Rate Method

    Authors: Korgaonker, M G;

    Reference No: PROD0149TEC Pages: 8 Published on: 1, January, 1979

    Abstract: Deals with the "reaction rate method" of production planning. The production control rule suggested by this approach is illustrated by means of an example. Broadly, the control rule determines the extent to which the preliminary production level should be adjusted to accommodate forecast errors. In achieving this, it focuses on ... More

  13. Elements of Scheduling

    Authors: Murthy, B S R; Korgaonker, M G;

    Reference No: PROD0150TEC Pages: 12 Published on: 1, January, 1979

    Abstract: The note deals with various aspects of scheduling problems in a job, such as technology, criteria for scheduling, scheduling single machine systems, and simulation results obtained using heuristic rules. ... More

  14. The Pathway Criticals Limited I

    Authors: Korgaonker, M G;

    Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980

    Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More

  15. Work Analysis

    Authors: Korgaonker, M G;

    Reference No: PROD0161TEC Pages: 15 Published on: 1, January, 1980

    Abstract: Deals with the technique of work analysis, covering various aspects like procedures used to select the job for study, recording instruments, critical evaluation of recorded data, and development of improved methods of performing work. ... More