Reference No: MAR0163Pages: 10Published on: 1, January, 1977
Abstract: The company makes various forms of packaging. Since the demand comes from a diverse set of consumer industries, the company prepares a longterm forecast based on the growth projections of user industries. The sales force prepares a forecast for the immediate future. The company wants to integrate the forecasts ... More
Reference No: MAR0185Pages: 4Published on: 1, January, 1977
Abstract: A consumer goods company is interested in evaluating the performance of its dealers. A quarterly statement, giving information on profitability and capital structure, is obtained from the dealers. The issues in the case concern the interpretation and analysis of the statements of two dealers. Interesting possibilities exist for analyzing dealer ... More
Reference No: F&A0298Pages: 5 Published on: 1, January, 1977
Abstract: A comprehensive case in cost analysis for management decisions in a joint cost situation. This is a modified version of the "Coco Seed Oil Company"F&A0254 case on the same topic.Unlike the earlier version where the price needs to be computed from a given set of cost ... More
Reference No: P&IR0032Pages: 19Published on: 1, January, 1977
Abstract: The case deals with the evaluation of two selection instruments, the IQ test and the written essay type test, on the basis of an organization's experience. ... More
Reference No: PSG0037Pages: 11Published on: 1, January, 1977
Abstract: This case describes the population education programme conducted by the Family Planning Association of India. After three years of the programme, the director was keen to review the efforts. The case writer interviewed several people connected with the project and they felt that a systematic evaluation of all the activities ... More
Reference No: F&A0306Pages: 2 Published on: 1, January, 1977
Abstract: Presents a problem in sales variance analysis. Total sales variance can be analyzed into price, quantity, and mix variances. Raises a special problem concerning quantity variance when the sales department sells more than what is produced. The variances can be worked out in three different units?revenue, profit, and contribution. ... More
Reference No: QM0112Pages: 23Published on: 1, January, 1977
Abstract: Deals with the problem of preparing a timetable for a state transport corporation. The main objective is to determine the minimum number of buses required to operate a given number of trips. Several other problems like crew utilization, load factor determination, etc had to be considered. ... More
Reference No: P&IR0072(B)Pages: 7Published on: 1, January, 1977
Abstract: This case deals with the problems of manpower planning for workers' category in TELCO, Poona. It gives the steps followed by the Manpower Planning Cell between 1969-73 up to the stage of submission of Manpower Planning Proposal No.2. This proposal identifies the phased needs for manpower, locates alternative sources for ... More
Reference No: MAR0161Pages: 8 Published on: 1, January, 1977
Abstract: A large multidivision, multinational company based in Chicago forms a new Product Analysis Group. This group is to screen new product proposals emanating from various divisions. A complex set of criteria has to be satisfied. ... More
Reference No: F&A0295Pages: 6 Published on: 1, January, 1977
Abstract: The case provides, in a summarized form, the actual performance of a mediumsized hotel and five other hotels of varying sizes for four year period. The objective is to use these data for performance assessment and cost control. The problem in using past actuals or actuals of comparable units ... More
Reference No: F&A0312(B)Pages: 3Published on: 1, January, 1977
Abstract: Gives additional information on losses to correct the accounting treatment followed in Case (A), where losses are ignored. Introduces the concepts of standard loss, abnormal loss, and abnormal gain. Excludes treatment of opening work-in-process. ... More
Reference No: P&IR0031(A)Pages: 6Published on: 1, January, 1977
Abstract: Deals with the Graduate Engineer Training Scheme in TELCO's factory. The scheme started in 1967, was expected to supply bright and capable engineers to the new plant being set up. The scheme ran into several difficulties and had to be modified substantially between 1971 and 1974. Despite the modifications, the company was not ... More