Reference No: MAR0215(C)Pages: 11Published on: 1, January, 1979
Abstract: The case presents a typical situation in consumer durables marketing, highly competitive market, and extremly price conscious consumers. Product differentiation is not particularly evident. The Divisional Manager of Gujarat Industrial Distributors, who has a great deal of autonomy in developing the market strategy for the region for which he is ... More
Reference No: PSG0013TECPages: 8Published on: 1, January, 1979
Abstract: Saraspur PHC, under the control of the District Health Officer
(DHO), was showing poor performance in all programmes.
Moreover, its performance was deteriorating every month. This
surprised the DHO, for so far Saraspur had registered average
performance. Recently, it had been taken over by the regional
training centre as a ... More
Reference No: CMA0476Pages: 5Published on: 9, July, 1979
Abstract: Describes the traditional business practices in the unorganized/decentralized handloom sector with special reference to the master-weavers system. The managerial need to protect the human needs of the weavers through organization interventions are the basic issues raised in the case. ... More
Reference No: CMA0386Pages: 10Published on: 13, December, 1979
Abstract: Gambhirpura Collective Farming Society was formed in 1953. Within two years, the society ran into problems. In the general body meeting, the Chairman listed the problems faced by the society and stated that the members could improve their economic conditions if they could identify an operational solution to involve all the ... More
Reference No: PROD0152TECPages: 10Published on: 1, January, 1980
Abstract: ABC analysis is a basic tool for analysing the characteristics of a range of items at an aggregate level. In this note the applications of ABC analysis to two important areas of inventory management is considered:( 1 ) the estimation of aggregate inventory characteristics, and ( 2 ) designing individual item decision models using ABC ... More
Reference No: CMA0524Pages: 10Published on: 1, January, 1980
Abstract: Discusses the uncertainties involved in providing tubewells in Chaloda village as a part of the developmental activities of a voluntary agency. Though, formal sources are available for financing the project, the farmers are not organized in getting the finances and managing the project. For want of data of the risk ... More
Reference No: PROD0162TECPages: 4Published on: 1, January, 1980
Abstract: This note deals with the capacity measurement of a production system. Various factors influencing capacity are highlighted, and their effects on capacity measurement are discussed. ... More
Reference No: F&A0339(D)Pages: 32 Published on: 1, January, 1980
Abstract: Analyses, interprets and illustrates many aspects of the concepts and practices of financial management. The case facilitates discussion of: 1) conversion of a private limited company into a public limited company; 2) public issue; 3) stock exchange listing; 4) cost of capital; 5) capital expenditure planning; 6) capital structure planning; 7) analysis of business and financial risks ... More
Reference No: CMA0520Pages: 2Published on: 1, January, 1980
Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More
Reference No: PROD0160Pages: 4Published on: 1, January, 1980
Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More
Reference No: PROD0167Pages: 2 Published on: 1, January, 1980
Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More