Reference No: PSG0037Pages: 11Published on: 1, January, 1977
Abstract: This case describes the population education programme conducted by the Family Planning Association of India. After three years of the programme, the director was keen to review the efforts. The case writer interviewed several people connected with the project and they felt that a systematic evaluation of all the activities ... More
Reference No: PROD0125TECPages: 2Published on: 1, January, 1977
Abstract: This note focuses on a job enrichment programme in the control room of a chemical plant. The operators have to follow operations carefully, adjust mix controls, monitor reactions, and record voluminous data on each batch process. As they have to adopt written standard operating procedures, the jobs are highly routine. ... More
Reference No: F&A0295Pages: 6 Published on: 1, January, 1977
Abstract: The case provides, in a summarized form, the actual performance of a mediumsized hotel and five other hotels of varying sizes for four year period. The objective is to use these data for performance assessment and cost control. The problem in using past actuals or actuals of comparable units ... More
Reference No: MAR0167Pages: 7 Published on: 1, January, 1977
Abstract: The case deals with product line evaluation of a mediumsized distributor of consumer durables. Performance of the product lines carried is evaluated using three different criteria, namely, gross profit, percentage profit margin, and return on investment. An attempt is made to demonstrate the superiority of ROI criterion over the ... More
Reference No: PROD0132TECPages: 17Published on: 1, January, 1977
Abstract: Describes in detail the "systematic layout planning" technique of plant layout. Various steps involved in the use of the technique, i.e. product?quantity analysis, flow of materials analysis, analysis of activity relationship, construction of flow and/or activity relationship diagram, determination of space requirements, construction of space relationship diagram, ... More
Reference No: BP0087(B)Pages: 15Published on: 1, January, 1977
Abstract: This is a complementary case to the SAIL (A) case. While the (A) case describes the organization structure and systems of the holding company, (B) case describes the concerns of Parliament. (B) case can either be used along with the (A) case or in a separate session after the (A) ... More
Reference No: PROD0123TECPages: 10Published on: 1, January, 1977
Abstract: Deals with the use of work sampling for setting up output standards in a packing?cum?shipping department. As a variety of cartons/boxes are involved, time study may be impractical. Work sampling study can be conveniently used for setting up the standards. ... More
Reference No: QM0120Pages: 10Published on: 1, January, 1977
Abstract: Describes the problem of traffic congestion at a busy crossing in Ahmedabad. Data has been provided on the pattern of arrival of different modes of transport from different directions at the square. Issues arising out of heterogeneity in modes of transportation are raised and alternative ways of resolving this problem ... More
Reference No: MAR0164(A)Pages: 9Published on: 1, January, 1977
Abstract: A cooperative dairy in a rapidly growing industrial city is considering the introduction of automatic bulk vending. Many uncertainties are associated with the costs and convenience of bulk vending as compared to bottle vending. ... More
Reference No: PSG0021Pages: 4 Published on: 1, January, 1977
Abstract: The case discusses the preparations needed by a branch of the FPAI to start a mobile education-cum-service unit (MESU). The officials would need a plan to get the project started, hire and train staff, select the area, and so on. Where should it begin? ... More
Reference No: PROD0130TECPages: 3Published on: 1, January, 1977
Abstract: Explains the use of the process chart and assembly process chart in the study of a transformation process involving complex flow of products and subassemblies. Process chart is a powerful tool having applications in method improvement programme, layout of plant facilities, etc. By recording the flow of materials, products, etc, ... More
Reference No: F&A0307Pages: 2 Published on: 1, January, 1977
Abstract: Deals with a problem in overhead cost variance. The excess consumption of steam in a spinning mill has to be analyzed into variances arising from 1) cost of producing steam, 2) hourly rate of supply of steam, 3) number of hours worked, and 4) efficiency of spinning. Requires logic rather than application of standard ... More