Reference No: PROD0173TECPages: 14Published on: 1, January, 1982
Abstract: This note reviews the developments in the field of multiple?criteria decision-making (MCDM) together with developments in related areas such as utility theory and decision theory. Multiple criteria problems and basic approaches to solve these problems are mentioned. Direct estimation approach and interactive approach for estimating decision?makers' preferences are ... More
Reference No: CMA0562TECPages: 5Published on: 1, January, 1982
Abstract: Some of the distinguishing features of forestry as an economic activity have been summarized to provide a basis for discussion on whether 1) forest development projects carry relatively higher risks, 2) intangible benefits and costs of forestry projects can or cannot be accounted for in assessing bankability, and 3) multiple objectives in forest ... More
Reference No: F&A0353Pages: 3Published on: 1, January, 1982
Abstract: The case is meant to illustrate the basic concepts of inventory management. Some knowledge of EOQ is necessary. It throws light on variable lead times, discount on items purchased, and the two systems of managing inventory?the continuous review and the periodic review systems. ... More
Reference No: CMA0555(D)Pages: 21Published on: 1, January, 1982
Abstract: Considers procurement, storage-transport, milling-storage and distribution in an integrated manner. The chairman is faced with the problem of deciding whether he should set up a modern storage and processing complex as against the existing disintegrated system. ... More
Reference No: PROD0175(D)TECPages: 12Published on: 1, January, 1982
Abstract: Discusses the models for determining Economic Order Quantities (EOQs) for items in a multi?item situation with constraints. The derivation of EOQs for items under the constraint of average total investment in inventories is given. The EOQs for items where there is a constraint on total workload (i.e., number ... More
Reference No: QM0176TECPages: 3Published on: 1, January, 1982
Abstract: Outlines key issues in managing the process of replication in development programmes. It refers to questions about content and context of replication; roblems of moving from projects to programmes; and issues related to the transfer of learning from one to the other. ... More
Reference No: PSG0047(B)Pages: 10 Published on: 1, January, 1982
Abstract: The cases Antyodaya (A) and (B) present the experience of planning and implementing a target group specific development programme of a state government. The cases highlight the positive features in the implementation of the programme and raise questions about its design in the context of the kind of beneficiaries, the ... More
Reference No: BP0144(G)Pages: 28Published on: 1, January, 1983
Abstract: Starting with the history of industrial relations and unionism, attention is directed to key areas which off and on have accounted for the industrial relations problems in Voltas. These areas are: amalgamation of associated companies, EDP, emergence of VOLSA, contract labour, and agitation by instalment. The stands taken by the ... More
Reference No: CMA0571(B)Pages: 23Published on: 1, January, 1983
Abstract: The case is a continuation of Case (A). It explains the levels of decision-making, concerns at each level, and information flows. It raises the issues of management of information flows. ... More
Reference No: BP0144(E)Pages: 30Published on: 1, January, 1983
Abstract: Traces the evolution of the marketing function in Voltas, and outlines the current marketing organization. The Case explores the implications of the million dollar question faced by the management: What did it mean to have the diverse marketing activities under one umbrella--Voltas? ... More
Reference No: CMA0568TECPages: 7Published on: 1, January, 1983
Abstract: This note covers some important concepts and methods which are normally used for project appraisal. Concepts and methods covered include (1) budgeting 'model' situation, (2) incremental concept, (3) current or constant prices, (4) direct and indirect impacts of a project, (5) acquisition and opportunity costs, (6) initial investment and terminal values, (7) time horizon, (8) time value of ... More
Reference No: PROD0178TECPages: 13 Published on: 1, January, 1983
Abstract: Deals with various aspects of short interval scheduling (SIS) such as significance and applications in various areas like production planning and control, fabrication and assembly work, maintenance, engineering work, clerical operations, and material handling. Management reporting in an SIS environment is also dealt with. ... More
Reference No: BP0144(C)Pages: 52Published on: 1, January, 1983
Abstract: Gives a historical overview of the manufacturing operations, and outlines the organizational setup for manufacturing. Discusses the strengths, weaknesses, threats, opportunities and the thrust of the manufacturing policy, and the strategic shift required for attaining the corporate objective of "Profit-Growth-Excellence." ... More
Reference No: QM0177TECPages: 22Published on: 1, January, 1983
Abstract: Deals with the development of a simulation model to study the various schedule algorithms for the IIMA HP timesharing system having sixteen users. Studies various algorithms that have been decided on the basis of short and long jobs as well as variation in the time slice. Flow time and queue ... More
Reference No: CMA0582(A)Pages: 13Published on: 1, January, 1983
Abstract: Deals with the functioning of integrated cooperative structure in a geographical area, and explores the possibility of replicability of the experiences in another area under the cooperative framework. The case also examines the role that Samakya, a rural development agency, can play in promoting vertical integration in paddy processing and ... More