Reference No: PROD0127TECPages: 2Published on: 1, January, 1977
Abstract: This note deals with problem of job design for employee motivation. This is particularly true of jobs that are highly monotonous, jobs with very low levels of skill requirements, etc. Among some recent experiments in job design, an approach that has reported some degree of success is job enrichment. This ... More
Reference No: QM0104Pages: 8Published on: 1, January, 1977
Abstract: Deals with the problem of establishing the aggregate production capacity of a small ceramics shop which manufactures a variety of ceramic articles. The case describes the production process, including the equipment used, and details of the various products manufactured (such as the number of articles per set, sizes, weights, number ... More
Reference No: QM0130Pages: 9Published on: 1, January, 1977
Abstract: Deals with problems in statistical quality control, especially process control and acceptance sampling, in a large engineering company. ... More
Reference No: MAR0163Pages: 10Published on: 1, January, 1977
Abstract: The company makes various forms of packaging. Since the demand comes from a diverse set of consumer industries, the company prepares a longterm forecast based on the growth projections of user industries. The sales force prepares a forecast for the immediate future. The company wants to integrate the forecasts ... More
Reference No: PSG0020TECPages: 4 Published on: 1, January, 1977
Abstract: The note outlines the steps that a branch of the Family Planning
Association of India would need to take in formulating a branch
study. This would require: 1) Defining the broad goals and objectives
of the branch in terms of services to be provided, client
segments, regional coverage, and channels to ... More
Reference No: PROD0134TECPages: 1 Published on: 1, January, 1977
Abstract: Illustrates the use of the multiple activity chart for balancing the activities of multiple machines. The example involves dumpers and a shovel used in the construction of a parking lot. The chart is similarly useful for balancing the activities of multiple men and machines in a man?machine operating system. ... More
Reference No: F&A0306Pages: 2 Published on: 1, January, 1977
Abstract: Presents a problem in sales variance analysis. Total sales variance can be analyzed into price, quantity, and mix variances. Raises a special problem concerning quantity variance when the sales department sells more than what is produced. The variances can be worked out in three different units?revenue, profit, and contribution. ... More
Reference No: PROD0125TECPages: 2Published on: 1, January, 1977
Abstract: This note focuses on a job enrichment programme in the control room of a chemical plant. The operators have to follow operations carefully, adjust mix controls, monitor reactions, and record voluminous data on each batch process. As they have to adopt written standard operating procedures, the jobs are highly routine. ... More
Reference No: MAR0160TECPages: 69Published on: 1, January, 1977
Abstract: The note gives details of the cotton textile industry in India, relating to the product profile, industry structure, manufacturing process, distribution of textiles and the cost profitability and financial structure of the cotton textile industry in India. ... More
Reference No: PROD0132TECPages: 17Published on: 1, January, 1977
Abstract: Describes in detail the "systematic layout planning" technique of plant layout. Various steps involved in the use of the technique, i.e. product?quantity analysis, flow of materials analysis, analysis of activity relationship, construction of flow and/or activity relationship diagram, determination of space requirements, construction of space relationship diagram, ... More
Reference No: BP0087(B)Pages: 15Published on: 1, January, 1977
Abstract: This is a complementary case to the SAIL (A) case. While the (A) case describes the organization structure and systems of the holding company, (B) case describes the concerns of Parliament. (B) case can either be used along with the (A) case or in a separate session after the (A) ... More
Reference No: PROD0123TECPages: 10Published on: 1, January, 1977
Abstract: Deals with the use of work sampling for setting up output standards in a packing?cum?shipping department. As a variety of cartons/boxes are involved, time study may be impractical. Work sampling study can be conveniently used for setting up the standards. ... More
Reference No: QM0120Pages: 10Published on: 1, January, 1977
Abstract: Describes the problem of traffic congestion at a busy crossing in Ahmedabad. Data has been provided on the pattern of arrival of different modes of transport from different directions at the square. Issues arising out of heterogeneity in modes of transportation are raised and alternative ways of resolving this problem ... More