Filter By

Currently Shopping by:

  1. Remove This Item Sector: Transportation and Logistics
Discipline
  1. Accounting (1)
  2. Communication (2)
  3. Economics (1)
  4. Ethics and Governance (1)
  5. Finance (7)
  6. Human Resource Management (1)
  7. IT and Systems (5)
  8. Management Education (1)
  9. Marketing (3)
  10. Operations Management (18)
  11. Organizational Behaviour (11)
  12. Public Policy and Law (15)
  13. Quantitative Methods (1)
  14. Strategic Management (13)
Language
  1. English (28)
State
  1. Andhra Pradesh (1)
  2. Delhi (1)
  3. Kerala (1)
  4. Madhya Pradesh (1)
  5. Maharashtra (1)
  6. Tamil Nadu (1)
Product Type
  1. Case (25)
  2. Exercise (1)
  3. Technical Note (3)

Your search 'Logon Project' did not match any products.
Showing results using some of your search terms 'Logon Project'

Search results for 'Project'

per page
  1. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (B)

    Authors: Dutta, Goutam; Sarkar, Debasis;

    Reference No: PSG0144(B) Pages: 17 Published on: 27, April, 2022

    Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More

  2. LTTIL: Coimbatore Bypass Project

    Authors: Raghuram, G; Kheskani, Deepa;

    Reference No: PSG0084 Pages: 11 Published on: 24, October, 2002

    Abstract: This case study discusses various issues in toll based BOT projects. L&T Transportation Infrastructure Limited (LTTIL), the BOT operator has been facing financial problems, experiencing a difficult time collecting tolls from the Athupalam Bridge segment of the Coimbatore Bypass project. Though LTTIL and the Government have been trying to ... More

  3. Project Financing for Sustainable Railways Project

    Authors: Garg, Amit; Beri, Pramod; Kasliwal, Siddhi;

    Reference No: PSG0132 Pages: 8 Published on: 18, March, 2020

    Abstract: The government is considering a semi high-speed rail project to tackle some of the current issues associated with the public transportation system in the proposed area. Given the hilly terrain of the area, the current means of transportation are very slow and unreliable. Several studies had shown that the lack ... More

  4. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (A)

    Authors: Dutta, Goutam; Sarkar, Debasis; Viswanath, Ashna;

    Reference No: PSG0144(A) Pages: 19 Published on: 27, April, 2022

    Abstract: The case discusses the situation of Mr. Madhavan, Managing Director of the Progressive Metro Rail Corporation, following the mayhem at the construction site of the metro. He has to submit a comprehensive risk management system to the Chief Minister and the cabinet ministers. Before developing a risk management system, it ... More

  5. Mhow Ghatabillod Road

    Authors: Raghuram, G; Parikh, Nayan;

    Reference No: PSG0095 Pages: 10 Published on: 4, November, 2004

    Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More

  6. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  7. Dispute Resolution in an ROB Infrastructure Project (D)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(D) Pages: 3 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  8. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  9. Urabian Airbus Project

    Authors: Balakrishnan, K;

    Reference No: QM0111 Pages: 12 Published on: 1, January, 1976

    Abstract: Deals with the problems associated with the introduction of five widebody Airbuses to replace a fleet of Turbo Props and Caravelles. As it is essential to synchronize the publicity campaign with the formal introduction of the Airbus, the management wants to know when the five aircraft will be ready ... More

  10. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  11. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  12. End User Computing in Shipping

    Authors: Rao, V Venkata;

    Reference No: CISG0029TEC Pages: 19 Published on: 18, April, 1995

    Abstract: This note summarizes the features of the following end user computing packages: 1. Spreadsheet Packages, 2. Data Management Packages, 3. Project Management Packages, 4. Presentation Software, 5. Computer-Aided Design, and 6. Multi-media Systems. In each category, wherever applicable, applications and new trends are also discussed. There is a section at the end that discusses the problems ... More

Items 1 to 15 of 35

per page

My Cart

You have no items
in your shopping cart.