Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Strategic Management
  2. Remove This Item Sector: Transportation and Logistics
Language
  1. English (11)
State
  1. Andhra Pradesh (1)
  2. Kerala (1)
  3. Madhya Pradesh (1)
Product Type
  1. Case (10)
  2. Technical Note (1)

Search results for 'project ma'

per page
  1. Making Metro Rail Work in Developing Countries: Overcoming Ridership and Financial Management Challenges

    Authors: Chakrabarti, Sandip; Verma, Muskan;

    Reference No: CTL0006 Pages: 32 Published on: 19, May, 2025

    Abstract: Against the backdrop of India’s unprecedented investments in urban and regional rail-based mass transportation systems, this case introduces Ms. Anuradha Dey, the Managing Director (MD) of a major Metro Rail Corporation, who is leading a major metro rail construction program in a medium-sized city of India. Ms. Dey is ... More

  2. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  3. Mhow Ghatabillod Road

    Authors: Raghuram, G; Parikh, Nayan;

    Reference No: PSG0095 Pages: 10 Published on: 4, November, 2004

    Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More

  4. Auto Care Centre: Shivranjini

    Authors: Jain, Abhinandan K; Dixit, M R; Bhat, Ramesh; Maheshwari, Sunil Kumar;

    Reference No: MAR0383 Pages: 14 Published on: 14, July, 2006

    Abstract: Abstract The case describes locations, facilities, infrastructure, market, manpower, customer profile, competition and performance of one training and experimentation outlet. It also describes different types of experiments (operations, service, and customer related) conducted at the outlet. Outlet in-charge / sales officer is faced with the issues of deciding what research/ experiments ... More

  5. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  6. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  7. Konkan Railway Corporation Limited

    Authors: Banerjee, Bibek; Raghuram, G; Rangaraj, Narayan;

    Reference No: MAR0321 Pages: 29 Published on: 3, May, 1999

    Abstract: Konkan Railway Corporation Limited (KRC) was set up as a Public Sector company under the Ministry of Railways in July 1990 to bridge the 738 km "Konkan Gap" by providing a railway connection between Roha (150 kms South of Mumbai) and Thokur (about 22 kms North of Mangalore). KRC completed the project at a ... More

  8. The Kandla-Bhatinda Pipeline Controversy

    Authors: Manikutty, S; Raghuram, G;

    Reference No: PSG0067 Pages: 27 Published on: 23, February, 1994

    Abstract: This case emphasizes the decision making process of infrastructure investments for the two modes of transportation of petroleum products between Kandla Port and North West India. Indian Oil Corporation made a proposal in 1981 for a new pipeline between Kandla and Bhatinda, in order to cater to the increased projected traffic ... More

  9. Hyderabad Metro Rail Limited

    Authors: Biyani, Nagendra; Raghuram, G;

    Reference No: CIPR0005 Pages: 30 Published on: 26, April, 2010

    Abstract: This case focuses on the way forward for Hyderbad Metro Rail Ltd (HMRL) as of July 2009, when the earlier winning bidder had to be served with a termination notice due to non compliance towards financial closure. The top management of HMRL was considering various alternatives before them: 1) Whether the second ... More

  10. Cochin International Airport Limited (A)

    Authors: Varkkey, Biju; Raghuram, G;

    Reference No: PSG0098(A) Pages: 44 Published on: 5, April, 2006

    Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More

  11. Commercial Vehicle Industry in India

    Authors: Dixit, M R;

    Reference No: BP0185TEC Pages: 19 Published on: 1, January, 1984

    Abstract: The note describes the structure and performance of the commercial vehicle industry in India. Data on sales, production and financial performance of various companies operating in the industry are given. Also given are data on the plans of existing companies and those of new entrants. The student is required to ... More

  12. System Integration at Queen Port Trust

    Authors: Pandey, Ajay; Raghuram, G;

    Reference No: CISG0080 Pages: 13 Published on: 5, September, 2003

    Abstract: In early 1999, Canto Systems Limiteds (CSL) bid was the only response to Queen Port Trusts (QPT) tender for the supply/ installation of hardware, and the development of software. The tender quote, however, did not include any documented basis for determining the total person-months and bid amounts. While the final contract ... More

per page

My Cart

You have no items
in your shopping cart.