Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Strategic Management
  2. Remove This Item Language: English
Sector
  1. Education (1)
  2. Government (6)
  3. Health (1)
  4. Infrastructure (4)
  5. Manufacturing (10)
  6. Mining (1)
  7. Public Sector (3)
  8. Transportation and Logistics (5)
State
  1. Andhra Pradesh (1)
  2. Gujarat (3)
  3. Kerala (1)
  4. Maharashtra (2)
Product Type
  1. Case (17)
  2. Technical Note (1)

Search results for 'PROJECT MANAGEMENT'

per page
  1. Reinventing Project Management at Tata Steel (A): Implementation of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(A) Pages: 13 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  2. Reinventing Project Management at Tata Steel (B): Revamp of Blast Furnace F

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(B) Pages: 7 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  3. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  4. Jeevika: Livelihood Security Project

    Authors: Vyas, Preeta H;

    Reference No: PSG0104 Pages: 18 Published on: 23, June, 2008

    Abstract: The Director of SEWA is discussing with her PMU (Project Management Unit) team of the indicators of Jeevika -- both quantitative and qualitative -- which should be considered for mid-term review of Jeevika project. The case contains information on Jeevika project, mid-term review of Jeevika project, various stakeholders and their ... More

  5. Cochin International Airport Limited (A)

    Authors: Varkkey, Biju; Raghuram, G;

    Reference No: PSG0098(A) Pages: 44 Published on: 5, April, 2006

    Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More

  6. Dharavi Redevelopment Project: Strategy for Project Implementation

    Authors: Ravichandran, N; Patel, Nikunjkumar; Lawrence, Russel ;

    Reference No: STR0477 Pages: 16 Published on: 4, September, 2023

    Abstract: The case presents the complexities involved in implementing a social project with specific reference to Dharavi Redevelopment Project (DRP) in Bombay. This project was awarded to Adani Group, a large business conglomerate in India. The multiple stakeholders in DRP include politicians, bureaucrats, population living in Dharavi, the manufacturing companies which ... More

  7. The Soil Health Card Project

    Authors: Vijaya Sherry Chand; Ravi, Jayanti S;

    Reference No: RJMC0022 Pages: 18 Published on: 13, June, 2012

    Abstract: The Commissionerate of Higher Education had motivated 55 science colleges to take up the Soil Health Card Project, a project of the Agriculture Department, under which 740,000 soil samples were tested in 2010. In 2011, there was a delay in obtaining approvals. The Commissionerate took some remedial steps and is about to obtain an ... More

  8. Torrent Gujarat Biotech Limited (C)

    Authors: Chandra, Pankaj; Chaudhuri, Shekhar; Dixit, M R; Rao, Sreenivas S; Rao, V Venkata;

    Reference No: BP0265 Pages: 8 Published on: 8, January, 2001

    Abstract: This case describes the situation faced by the management of Torrent Gujarat Biotech Limited (TGBL), a company that was set up to manufacture Penecillin G, an antibiotic, in mitigating unexpected developments in the policy and competitive environment. The economics of the penicillin project changed drastically when the government liberalized the ... More

  9. Hyderabad Metro Rail Limited

    Authors: Biyani, Nagendra; Raghuram, G;

    Reference No: CIPR0005 Pages: 30 Published on: 26, April, 2010

    Abstract: This case focuses on the way forward for Hyderbad Metro Rail Ltd (HMRL) as of July 2009, when the earlier winning bidder had to be served with a termination notice due to non compliance towards financial closure. The top management of HMRL was considering various alternatives before them: 1) Whether the second ... More

  10. Logical Framework Analysis

    Authors: Ramani, K V;

    Reference No: PSG0097TEC Pages: 5 Published on: 26, March, 2006

    Abstract: Logical Framework Analysis (LFA) was first formally adopted as a planning tool for overseas development activities by USAID in the early 1970s. Its origins can possibly be traced back to the private sector management concept of "Management by Objectives" approach of the 1960s. LFA has since been adopted and adapted ... More

  11. Barber and Barwil (A): Strategic Options

    Authors: Sharma, Yashoverman; Bhatnagar, Deepti; Raghuram, G; Sahay, Arvind;

    Reference No: BP0323(A) Pages: 27 Published on: 19, August, 2008

    Abstract: Wilh Wilhelmsen ASA of Norway was a traditional ship owning company that had diversified into the ?Maritime Services' sector. In addition to cargo transportation, its two main ?service' business areas were Ship Management (Barber International) and Port Agency (Barwil), established in 1975. Both companies had become big brand names in their ... More

  12. Making Metro Rail Work in Developing Countries: Overcoming Ridership and Financial Management Challenges

    Authors: Chakrabarti, Sandip; Verma, Muskan;

    Reference No: CTL0006 Pages: 32 Published on: 19, May, 2025

    Abstract: Against the backdrop of India’s unprecedented investments in urban and regional rail-based mass transportation systems, this case introduces Ms. Anuradha Dey, the Managing Director (MD) of a major Metro Rail Corporation, who is leading a major metro rail construction program in a medium-sized city of India. Ms. Dey is ... More

  13. Power Projects and Products Ltd. (C)

    Authors: Dixit, M R;

    Reference No: BP0220(C) Pages: 5 Published on: 1, January, 1990

    Abstract: This case describes the system developed by Power Projects and Products Limited for identifying and evaluating opportunities for the company. The senior management team at the company is required to evaluate the system and decide whether to accept it or not. ... More

  14. Vadodara Halol Toll Road

    Authors: Raghuram, G;

    Reference No: PSG0091 Pages: 17 Published on: 24, September, 2003

    Abstract: The management of the Vadodara Halol Toll Road Company Limited (VHTRL) was worried about the toll revenues. The actual revenues as a proportion of the projected revenues had declined from 63 percent to 34 percent over the three financial years of operation. Given the cash flows, the VHTRL could run smoothly only ... More

  15. Torrent Gujarat Biotech Limited (B)

    Authors: Chandra, Pankaj; Chaudhuri, Shekhar; Dixit, M R; Rao, Sreenivas S; Rao, V Venkata;

    Reference No: BP0263(B) Pages: 12 Published on: 8, January, 2001

    Abstract: This case describes the efforts of Torrent Gujarat Biotech Limited to mitigate unexpected developments in implementing a backward integration project. The management decided to develop the technology indigenously. It collaborated with a consortium of scientists in Europe and a research laboratory in USA. As of 1995, it was required to evaluate ... More

Items 1 to 15 of 19

per page

My Cart

You have no items
in your shopping cart.