Reference No: QM0279(A)Pages: 18Published on: 29, March, 2019
Abstract: Mr. Sajjan Jindal, MD of JVSL (nos JSW) wanted to bring the latest technology of iron making into India. His project went to several cost overrun and time overrun due to several foreseen and unforessen circumstances. This case discusses the issues new technology introduction in iron making area, problem faced ... More
Reference No: PROD0175(A)TECPages: 11Published on: 1, January, 1982
Abstract: Introduces the functions of inventories and various costs relevant for inventory management. The Economic Order Quantity (EOQ) model with deterministic demand and lead-time is discussed and basic derivations of the model are presented. Sensitivity of cost to various parameters of the model is discussed. Finally, the EOQ model with back ... More
Reference No: O&DS0010Pages: 6Published on: 28, November, 2025
Abstract: Dhariwal Infrastructure Limited, a subsidiary of the Calcutta Electric Supply Corporation Limited (part of the RP-Sanjiv Goenka Group), operates a 2 × 300 megawatt thermal power plant in Chandrapur, Maharashtra. To enhance risk management and process excellence, the plant identified the need for an improved monitoring system for the main oil tank in ... More