Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Public Policy and Law
  2. Remove This Item Sector: Infrastructure
Language
  1. English (18)
State
  1. Delhi (2)
  2. Goa (1)
  3. Gujarat (2)
  4. Uttar Pradesh (1)
Product Type
  1. Case (18)
  2. Technical Note (1)

Search results for 'AND OR ('

per page
  1. Mormugao Port Trust and South West Port

    Authors: Raghuram, G; Gangwar, Rachna;

    Reference No: CIPR0006 Pages: 13 Published on: 26, April, 2010

    Abstract: It was June 2008. The conflicts between Mormugao Port Trust (MoPT) and South West Port Limited (SWPL) on coal/coke handling once again surfaced following a report submitted by the National Environmental Engineering Research Institute (NEERI) concluding that residents of Vasco city near the port were inhaling coal pollution much beyond ... More

  2. Corporate Criminal Liability in India

    Authors: Ram Mohan, M P;

    Reference No: BP0438 Pages: 10 Published on: 10, December, 2019

    Abstract: The cases of Standard Chartered v. Directorate of Enforcement (2005), Iridium India v. Motorola Inc & Ors. (2011), and Sunil Bharti Mittal v. Central Bureau of Investigation represent a significant development in India’s corporate criminal liability jurisprudence. Standard Chartered reconciled mandatory imprisonment (as prescribed for punishing many offences under Indian law) with ... More

  3. Regulatory independence in India: A case of Atomic Energy Regulatory Board

    Authors: Gopakumar, K V; Ram Mohan, M P;

    Reference No: OB0242 Pages: 12 Published on: 17, July, 2020

    Abstract: This case discusses the evolution and role of India’s nuclear regulator - the Atomic Energy Regulatory Board (AERB). It examines the need for a regulator in the context of India’s nuclear energy programme, its roles and responsibilities, and issues / concerns pertaining to its independence and transparent decision making. ... More

  4. Planning and Implementation (HYVP): Decision Under Uncertainty

    Authors: Madappa, P P; Malya, M Meenakshi;

    Reference No: CMA0169 Pages: 10 Published on: 21, March, 1969

    Abstract: In June 1969, agriculture in Thanjavur district of Madras state was facing an unprecedented draught. Due to an unforeseen delay of monsoon in catchment areas, Cauvery reservoirs had reached an all time low. The 'Granary of South' as the district was known from time immemorial, was threatened with famine. The problem ... More

  5. CAQM and GRAP: Public Policy and Judiciary: A Technical Note

    Authors: Agarwal, Anurag K;

    Reference No: JSW0003TEC Pages: 11 Published on: 20, March, 2025

    Abstract: The role of the Supreme Court in formulating a policy to ameliorate air quality control in Delhi is an example of judicial activism. It can be said to be necessary due to lack of effective action by the legislature and the executive. The creation of the Commission for Air Quality ... More

  6. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (B)

    Authors: Dutta, Goutam; Sarkar, Debasis;

    Reference No: PSG0144(B) Pages: 17 Published on: 27, April, 2022

    Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More

  7. Mankastu, AirVisual and IQAir

    Authors: Agarwal, Anurag K. ;

    Reference No: STR0491 Pages: 9 Published on: 27, March, 2025

    Abstract: In 2016, Mankastu, an Indian company, entered into a memorandum of understanding (MoU) with Hong Kong–based AirVisual. The MoU would allow Mankastu to distribute AirVisual’s air quality monitors and purifiers in India. However, when the Swiss company, IQAir, took control of AirVisual, it decided to not honour the existing ... More

  8. Creating Regulatory Space: Spectrum Trade Deal and Competition Commission of India

    Authors: Jain, Rekha;

    Reference No: IITCOE0009 Pages: 13 Published on: 30, December, 2019

    Abstract: This case focuses on regulatory institutions in a fast-changing evolving policy domain of the telecom sector in developing countries, which are typically characterised by a weak institutional environment, making operationalisation of new instruments that may require regulation across sectors difficult. The case highlights the criticality of appropriate regulatory design for ... More

  9. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (A)

    Authors: Dutta, Goutam; Sarkar, Debasis; Viswanath, Ashna;

    Reference No: PSG0144(A) Pages: 19 Published on: 27, April, 2022

    Abstract: The case discusses the situation of Mr. Madhavan, Managing Director of the Progressive Metro Rail Corporation, following the mayhem at the construction site of the metro. He has to submit a comprehensive risk management system to the Chief Minister and the cabinet ministers. Before developing a risk management system, it ... More

  10. Acquisition of Land for Expansion by Sarabhai Chemicals (A) **

    Authors: Chowdhry, Kamla;

    Reference No: OB0001(A) Pages: 7 Published on: 1, January, 1966

    Abstract: The case deals with problems of expansion of a company in Baroda, i.e. finding appropriate land, and negotiations with the government for acquiring this land. It raises questions regarding the government's industrial development policy. ... More

  11. Acquisition of Land for Expansion by Sarabhai Chemicals (B) **

    Authors: Chowdhry, Kamla;

    Reference No: OB0001(B) Pages: 2 Published on: 1, January, 1966

    Abstract: The case deals with problems of expansion of a company in Baroda, i.e. finding appropriate land, and negotiations with the government for acquiring this land. It raises questions regarding the government's industrial development policy. ... More

  12. Tata Docomo: Wrong Number

    Authors: Agarwal, Anurag K;

    Reference No: STR0481 Pages: 37 Published on: 26, November, 2024

    Abstract: In January 2017, N. Chandrasekaran was appointed the Chairman of Tata Sons (hereafter Tata), and soon after taking charge he decided to resolve the long-pending dispute with Docomo. Tata had agreed to pay more than US$1 billion to Docomo to honour an international arbitral award. After going through the long legal ... More

  13. Vizhinjam International Seaport Ltd (VISL)

    Authors: Sinha, Sidharth;

    Reference No: F&A0542 Pages: 23 Published on: 26, March, 2019

    Abstract: Government of Kerala, through its special purpose vehicle (SPV) - Vizhinjam International Seaport Ltd (VISL), intended to develop a deep-water Multipurpose Greenfield Port at Vizhinjam in Thiruvananthapuram, capital city of Kerala. After a decade of planning and several failed attempts, the proposed project was being offered for bidding as a ... More

  14. DMRC–DAMEPL Dispute

    Authors: Agarwal, Anurag K. ;

    Reference No: PSG0147 Pages: 21 Published on: 21, July, 2025

    Abstract: In 2024, the Supreme Court of India decided a long-pending dispute between the Delhi Metro Rail Corporation (DMRC) and the Delhi Airport Metro Express Private Limited (DAMEPL) in favour of the former by setting aside an arbitral award of about ₹8,000 crores. Later, it issued contempt notices to the DAMEPL and Axis ... More

  15. Dispute Resolution in an ROB Infrastructure Project (D)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(D) Pages: 3 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

Items 1 to 15 of 20

per page

My Cart

You have no items
in your shopping cart.