Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
  2. Remove This Item Sector: Public Sector
Language
  1. English (17)
State
  1. Andhra Pradesh (2)
  2. Bihar (3)
  3. Gujarat (2)
  4. West Bengal (1)
Product Type
  1. Case (15)
  2. Technical Note (3)

Search results for 'project ma'

per page
  1. Challenges in East West Underwater Metro Project in Kolkata

    Authors: Dutta, Goutam;

    Reference No: PSG0140 Pages: 34 Published on: 16, November, 2021

    Abstract: The case discusses the uncertainties and complexities faced by Kolkata Metro Rail Corporation during the construction of India’s first under river metro in Kolkata. Kolkata East West Metro Corridor project comprises of an under river tunnel that is constructed underneath river Hooghly. The major task of KMRC was to ... More

  2. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (C)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(C) Pages: 19 Published on: 22, March, 2021

    Abstract: This case deals with the project on establishing a rural piped water supply scheme in a village of Bihar. The Chief Engineer, Public Health Division, Patna, Bihar called his team members to have the fourth and final meeting to discuss the resource scheduling, materials management and the man-power requirements in ... More

  3. Navanagar ICD Project (ICD 6B) **

    Authors: Murty, A G K;

    Reference No: CMA0159(B) Pages: 9 Published on: 6, November, 1968

    Abstract: The study concentrates on the ICD project officer's problems concerning the techno-economics of the semen bank which is producing semen for the entire district's artificial insemination programme. ... More

  4. Gujarat State Fertilizers Company Limited (A)

    Authors: Aggarwal, S C;

    Reference No: PROD0026(A) Pages: 10 Published on: 1, January, 1967

    Abstract: The case describes the application of PERT and CPM techniques to the project construction operations of a fertilizer plant in India. It indicates all the necessary steps, which must be taken before starting with the introduction of PERT, and how PERT helps in spotlighting troubles earlier. The student is expected ... More

  5. Pramukh Swami Maharaj Shatabdi Mahotsav: Event Scale

    Authors: Gupta, Vishal; Gandhi, Manan;

    Reference No: ADCLOD0003 Pages: 34 Published on: 25, November, 2024

    Abstract: The case discusses the organisation – planning, construction, running and the winding-up – of the month-long Pramukh Swami Maharaj (PSM) Shatabdi Mahotsav (centenary festival) on a gigantic 600-acre site called the ‘Pramukh Swami Maharaj Nagar ’ held at the outskirts of Ahmedabad, Gujarat from December 15, 2022 to January 15, 2023. The case presents the details of ... More

  6. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  7. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(B) Pages: 20 Published on: 22, March, 2021

    Abstract: A week after the first meeting, the Chief Engineer, Public Health Division, Patna, Bihar wanted to have a second meeting to discuss the development of a network diagram. In this meeting, he requested all the stakeholders to attend the meeting and discussed how the network diagram can be developed with ... More

  8. Konkan Railway Corporation Limited

    Authors: Banerjee, Bibek; Raghuram, G; Rangaraj, Narayan;

    Reference No: MAR0321 Pages: 29 Published on: 3, May, 1999

    Abstract: Konkan Railway Corporation Limited (KRC) was set up as a Public Sector company under the Ministry of Railways in July 1990 to bridge the 738 km "Konkan Gap" by providing a railway connection between Roha (150 kms South of Mumbai) and Thokur (about 22 kms North of Mangalore). KRC completed the project at a ... More

  9. Pipavav Railway Corporation Limited (A)

    Authors: Raghuram, G; Len Varghese George; Nishant Thusoo; Satyam Shivam Sundarm;

    Reference No: CIPR0004(A) Pages: 36 Published on: 23, March, 2010

    Abstract: This case focuses on risk identification in the context of a railway Public Private Partnership (PPP) project. The perspective is that of a lender. The project was to provide broad gauge (BG) rail connectivity to Pipavav port from Surendranagar, over a distance of 265 kms. The case provides the salient features ... More

  10. A Note on Formal Corporate Planning

    Authors: Dixit, M R;

    Reference No: BP0182TEC Pages: 17 Published on: 1, January, 1984

    Abstract: This note presents a comprehensive view of the various dimensions of formal corporate planning. It covers aspects like stepwise process for formulating corporate plans effectively and efficiently; discussion of various types of plans like strategic, operational and project plans; organizing for planning and the role of the corporate planner; reasons ... More

  11. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (A)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(A) Pages: 19 Published on: 22, March, 2021

    Abstract: This case deals with a project on establishing a rural piped water supply scheme in a village of Bihar. The Joint Chief Engineer, Public Health Division, Patna, Bihar, wanted to have a meeting to discuss his project. His team consisted of the village head, the Joint Chief Engineer (JEC) or ... More

  12. Bharat Construction Company Limited (A)

    Authors: Shukla, P R;

    Reference No: PROD0192(A) Pages: 15 Published on: 1, January, 1984

    Abstract: The case can be used to discuss the management control system in a new project. An existing MCS for a large construction company is described and management problems faced by the company in handling a new project are highlighted. The new MCS that can be suitable for the situation can ... More

  13. Financial Planning and Appraisal of a Project

    Authors: Gupta, Ramesh;

    Reference No: F&A0399TEC Pages: 7 Published on: 1, January, 1989

    Abstract: This note is a description of various steps involved in preparation and appraisal of financial estimates of a project. The emphasis is on accuracy of various assumptions behind the financial estimates. To assess the risk inherent in a proposal, sensitivity analysis with regard to main assumptions must form an integral ... More

  14. Core Competence: A Strategic Overview (Computerized Slides)

    Authors: Madhavan, T; Thomas, Philip S;

    Reference No: IMG0013TEC Pages: 11 Published on: 24, July, 1996

    Abstract: This is a set of about 20 slides prepared using Harvard Graphics for computerized projection purposes. It outlines ideas about core competence to facilitate operationalization of the concept by managers. Its coverage includes a) the core competence effect b) the dimensions of core competence c) the tests for core competence d) ... More

  15. Hyderabad Metro Rail Limited

    Authors: Biyani, Nagendra; Raghuram, G;

    Reference No: CIPR0005 Pages: 30 Published on: 26, April, 2010

    Abstract: This case focuses on the way forward for Hyderbad Metro Rail Ltd (HMRL) as of July 2009, when the earlier winning bidder had to be served with a termination notice due to non compliance towards financial closure. The top management of HMRL was considering various alternatives before them: 1) Whether the second ... More

Items 1 to 15 of 19

per page

My Cart

You have no items
in your shopping cart.