  1. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  2. Plant Layout **

    Authors: Chand, S; Gopinath, C; Mukherjee, S K;

    Reference No: PROD0102TEC Pages: 5 Published on: 1, January, 1974

    Abstract: Layout of physical facilities is an integrating phase of design of production systems. Materials handling cost, safety of workers, flexibility for plant expansion in future, etc, depend on plant layout to a large extent. This note briefly discusses some of the popular plant layout techniques. The spiral chart technique has ... More

  3. Voltas Limited (F) : An Integrated Case Series

    Authors: Saiyadain, M S;

    Reference No: BP0144(F) Pages: 10 Published on: 1, January, 1983

    Abstract: Traces the history of the Personnel Cell, and focuses its attention on such personnel functions as manpower planning, recruitment and selection, promotion, salary administration, and non-statutory welfare. A series of issues relating to these functions have been raised to signify their importance to the organization as a whole. ... More

  4. Asoka Spintex

    Authors: Gupta, Parvinder;

    Reference No: OB0191 Pages: 24 Published on: 27, March, 1998

    Abstract: Asoka Spintex, formerly known as Asoka Mill Ltd., was set up in 1920, not doing well. Most of textile mills in the country were not doing well in the 1980s owing to rising costs, competition from powerlooms, and heavy demand recession. To meet this situation, the company decided to upgrade the ... More

  5. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  6. International Builders Limited

    Authors: Haribhakti, Shailesh;

    Reference No: F&A0349 Pages: 3 Published on: 1, January, 1981

    Abstract: The basic elements of the control system initially envisaged by the company were 1) PERT/cost system to monitor project progress and related costs; 2) material and labour cost standards to form the basis of comparison with actuals; and 3) an overhead budget which identified the various manufacturing, finance, and administration overheads by ... More

  7. Food Corporation of India, Andhra Pradesh

    Authors: Raghuram, G;

    Reference No: QM0234 Pages: 4 Published on: 1, January, 1993

    Abstract: This case examines the monthly allocation decision between procurement centres and depots for the intra-state movement of rice in Andhra Pradesh. The decision is complicated by the presence of three types of rice and change of gauge points on the railway ... More

  8. Voltas Limited (D): Finance

    Authors: Kuchhal, S C;

    Reference No: BP0144(D) Pages: 24 Published on: 1, January, 1983

    Abstract: Reviews the company's performance during a seven-year period--1974-75 to 1980-81. Voltas had resorted to certain operational strategies having significant financial implications: 1) it altered its method of calculating depreciation on its fixed assets; 2) it entered into foreign collaboration for its international operations; 3) it absorbed two of its affiliate companies with ... More

  9. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More