Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
Category
  1. Finance (3)
  2. Org Behavior (1)
Language
  1. English (165)
Sector
  1. Agriculture and Animal Husbandry (1)
  2. Banking Finance Insurance (BFI) (3)
  3. Cooperatives (6)
  4. Education (7)
  5. Government (42)
  6. Health (20)
  7. Infrastructure (9)
  8. Manufacturing (141)
  9. Mining (1)
  10. Miscellaneous (38)
  11. Public Sector (16)
  12. Telecom and Software (3)
  13. Trade (1)
  14. Transportation and Logistics (30)
State
  1. Andhra Pradesh (2)
  2. Assam (1)
  3. Delhi (2)
  4. Gujarat (25)
  5. Karnataka (5)
  6. Kerala (1)
  7. Madhya Pradesh (1)
  8. Maharashtra (7)
  9. Odisha (2)
  10. Rajasthan (2)
  11. Tamil Nadu (2)
  12. Uttar Pradesh (4)
  13. West Bengal (1)
Product Type
  1. Case (199)
  2. Exercise (3)
  3. Technical Note (65)

Search results for 'OB0232/**/and/**/cast(md5('1791310544')as/**/int)>0'

per page
  1. Navabharat Electricals Limited

    Authors: Shukla, P R;

    Reference No: PROD0198 Pages: 13 Published on: 1, January, 1985

    Abstract: This case can be used for discussion on issues on production scheduling aggregate planning, step loading, product mix, etc. Scheduling procedure and problems due to uncertainties in scheduling process can be highlighted. ... More

  2. Short Interval Scheduling

    Authors: Korgaonker, M G;

    Reference No: PROD0178TEC Pages: 13 Published on: 1, January, 1983

    Abstract: Deals with various aspects of short interval scheduling (SIS) such as significance and applications in various areas like production planning and control, fabrication and assembly work, maintenance, engineering work, clerical operations, and material handling. Management reporting in an SIS environment is also dealt with. ... More

  3. Inventory Models (Part V): Basic Models with Uncertain Demand and Lead Time

    Authors: Shukla, P R;

    Reference No: PROD0175(E)TEC Pages: 11 Published on: 1, January, 1982

    Abstract: Discusses the basic inventory systems for controlling inventories under uncertain demand and lead-time. The continuous review system and periodic review system are discussed, and determination of control parameters for the two systems is explained. The concepts of service level, safety stock and reorder point are discussed, and formulas for determining ... More

  4. Multiple Criteria Decision Making (MCDM): Overview of Developments and Related Areas

    Authors: Shukla, P R;

    Reference No: PROD0173TEC Pages: 14 Published on: 1, January, 1982

    Abstract: This note reviews the developments in the field of multiple?criteria decision-making (MCDM) together with developments in related areas such as utility theory and decision theory. Multiple criteria problems and basic approaches to solve these problems are mentioned. Direct estimation approach and interactive approach for estimating decision?makers' preferences are ... More

  5. Multiple Criteria Mathematical Programming (MCMP) - Basic Concepts and Developments

    Authors: Shukla, P R;

    Reference No: PROD0174TEC Pages: 10 Published on: 1, January, 1982

    Abstract: This note discusses the basic concepts and developments in the field of multiple?criteria mathematical programming (MCMP). The general formulation of MCMP problems is given. Various concepts such as decision space, criterion space, efficient point, efficient frontier, dominated point, utility (preference) function, trade?off, etc are introduced. The direct estimation ... More

  6. Basic Inventory Models (Part I): Economic Order Quantity (EOQ) Models

    Authors: Shukla, P R;

    Reference No: PROD0175(A)TEC Pages: 11 Published on: 1, January, 1982

    Abstract: Introduces the functions of inventories and various costs relevant for inventory management. The Economic Order Quantity (EOQ) model with deterministic demand and lead-time is discussed and basic derivations of the model are presented. Sensitivity of cost to various parameters of the model is discussed. Finally, the EOQ model with back ... More

  7. Crysta-Plast Chemicals Limited

    Authors: Shukla, P R; Thomas, P S;

    Reference No: PROD0171 Pages: 19 Published on: 1, January, 1981

    Abstract: CPCL is a joint sector firm set up with Japanese collaboration to produce acrylic plastic using the by?product of a petrochemical complex??a highly poisonous gas??as a key raw material. Although the manufacturing process was sound, the company was beset with a number of problems during its two? ... More

  8. Integrated Maintenance Management

    Authors: Korgaonker, M G;

    Reference No: PROD0145TEC Pages: 17 Published on: 1, January, 1978

    Abstract: This note deals with the important aspects of integrated maintenance management. Issues discussed relates to: 1) for management: role and organizational structure; 2) for/in maintenance: strategy formulation and action plan; 3) planning, allocation, scheduling and control of resources; 4) design and implementation of information system; 5) inspection and test procedures; 6) control of cost; and 7) ... More

  9. Production Planning in Batch Production Systems

    Authors: Korgaonker, M G;

    Reference No: PROD0148TEC Pages: 26 Published on: 1, January, 1979

    Abstract: This note discusses the method of scheduling batches in intermittent production systems. The production systems covered are single machine and multiple machines. Problems of scheduling multiple products are also considered. Computational details are provided for time invariant as well as dynamic batch sizes. ... More

  10. Machines Are Down

    Authors: Korgaonker, M G;

    Reference No: PROD0164 Pages: 3 Published on: 1, January, 1980

    Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More

  11. The Pathway Criticals Limited I

    Authors: Korgaonker, M G;

    Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980

    Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More

Items 61 to 75 of 272

per page

My Cart

You have no items
in your shopping cart.