Catalog Advanced Search

21 item(s) were found using the following search criteria
  • Authors: Kalro, A H

Don't see what you're looking for? Modify your search

per page
  1. Government Silk Filature, Chikkahalli

    Authors: Naik, Gopal; Kalro, A H;

    Reference No: CMA0705 Pages: 19 Published on: 1, January, 1990

    Abstract: The government silk filature, Chikkahalli is one of the four such units owned by the government of Karnataka. These units purchase silkworm cocoons from regulated cocoon markets and sell reeled silk in the silk exchanges. The Chikkahalli unit had been incurring losses for several years and all measures to improve ... More

  2. Mahapalika Rice Mills Company

    Authors: Kalro, A H;

    Reference No: QM0052 Pages: 7 Published on: 1, January, 1975

    Abstract: This case deals with estimating credit needs and examining the relationship between the credit needs and the operational decisions of procurement, milling and sales. The optimal purchase, production and sales decisions can be made with the help of linear programming. ... More

  3. Hydraulic Oil Inventory at "ABC Company"

    Authors: Kalro, A H; Satia, J K;

    Reference No: QM0086 Pages: 4 Published on: 1, January, 1976

    Abstract: Concerns the establishment of a suitable policy for purchase and stocking of hydraulic oil, a significant item in the company's raw material consumptions. The company has the option of purchasing from a local installation of IOC or from IOC's refinery (taking their blending programme into account) more than five hundred ... More

  4. Hindustan Wagon Builders Limited

    Authors: Kalro, A H;

    Reference No: QM0087 Pages: 7 Published on: 1, January, 1976

  5. Capacity Tangle

    Authors: Kalro, A H; Issac, Akkanad M; Narayanan, N;

    Reference No: QM0104 Pages: 8 Published on: 1, January, 1977

    Abstract: Deals with the problem of establishing the aggregate production capacity of a small ceramics shop which manufactures a variety of ceramic articles. The case describes the production process, including the equipment used, and details of the various products manufactured (such as the number of articles per set, sizes, weights, number ... More

  6. Scheduling of Operations at IIMA Computer Centre

    Authors: Kalro, A H; Kaul, Mohan;

    Reference No: QM0177TEC Pages: 22 Published on: 1, January, 1983

    Abstract: Deals with the development of a simulation model to study the various schedule algorithms for the IIMA HP timesharing system having sixteen users. Studies various algorithms that have been decided on the basis of short and long jobs as well as variation in the time slice. Flow time and queue ... More

  7. Simha Airlines: Aircraft Maintenance Scheduling

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0208 Pages: 11 Published on: 1, January, 1987

    Abstract: The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time taken for project completion. Most of the activities have single time estimates, while a few activities have three time estimates. ... More

  8. Indian Airlines: Caravelle Inventories

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0210 Pages: 15 Published on: 1, January, 1988

    Abstract: The case describes inventory-planning policies followed by Indian Airlines for preventive maintenance of its fleet of Caravelle aircraft that is on the verge of technological obsolescence. The objective is to determine whether the present inventory policies regarding: 1) classification of items, 2) system of stock review and replacement, 3) lead time analysis, and 4) ... More

  9. Indian Airlines: Caravelle Maintenance Planning

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0211 Pages: 5 Published on: 1, January, 1988

    Abstract: The case depicts a maintenance planning and scheduling problem for the Caravelle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are described. The objective is to develop preventive maintenance schedules to ensure proper utilization of the available ... More

  10. Iron Ore Distribution for Steel Authority of India Limited

    Authors: Kalro, A H; Shukla, P R; Tripathy, Arabinda; Raghuram, G;

    Reference No: QM0226 Pages: 22 Published on: 1, January, 1992

    Abstract: This case is an application of linear programming with a transportation model structure. The objective is to arrive at an iron ore distribution plan between the sources of iron ore and the various steel plants of SAIL. Quality requirements in terms of satisfying the blast furnace specifications have also to ... More

  11. Venky Toys

    Authors: Kalro, A H; Raghuram, G;

    Reference No: QM0227 Pages: 2 Published on: 1, January, 1991

    Abstract: This is a two variable problem in LP that can be used as an introductory case. It also has interesting issues related to shadow process, as well as scope for discussion on marginal contribution benefit versus average contribution benefit. ... More

  12. Kachchh Cooperative Sunflower Oil Mill (KACSOM)

    Authors: Kalro, A H;

    Reference No: QM0235 Pages: 8 Published on: 1, January, 1993

    Abstract: This case provides data on manufacturing process, raw material availability, management and organization, as well as project costs. It is meant to be used as an exercise in project appraisal. ... More

Items 1 to 15 of 21

per page

My Cart

You have no items
in your shopping cart.