Most Popular cases

List of Most Popular Cases

  1. Zorro Engineering Works Limited

    Authors: Sachdeva, P S;

    Reference No: P&IR0088 Pages: 8 Published on: 1, January, 1976

    Abstract: The case deals with the problems of performance appraisal at the officer level. The system being used in the organization includes self- reporting, followed by ratings by the superior officer against a list of personality traits and job responsibilities. The organizational diagnosis indicates problems at the time of recruitment, work ... More

  2. Process Evaluation System for a Family Planning Programme (A)

    Authors: Murthy, Nirmala; Satia, J K;

    Reference No: QM0102(A) Pages: 11 Published on: 1, January, 1976

    Abstract: Has been based on experience in developing information systems in India Population Project (District UP). ... More

  3. Punjab National Bank (C)

    Authors: Murthy, K R S;

    Reference No: BP0081(C) Pages: 5 Published on: 1, January, 1976

    Abstract: A sequel to the Punjab National Bank (B) (BP0082) case. It describes the bank officials reactions to the changes introduced by Mr Prakash Tandon [described in Case (B)]. It highlights the perceptions about the change agent and the problems created by the changes. ... More

  4. Processes and Projects (India) Limited (A)

    Authors: Bhattacharyya, S K;

    Reference No: F&A0281(A) Pages: 10 Published on: 1, January, 1976

    Abstract: PPIL is engaged in activities ranging from pure consultancy to total turnkey projects in high-technology fields, most of them of a pioneering nature. Case (A) describes how, faced with the various problems related to the high degree of diversity in the nature of projects and their geographical dispersion, the need ... More

  5. Arun Ranganath Deshpande (C)

    Authors: Ranade, Ashok; Malya, M Meenakshi;

    Reference No: QM0100(C) Pages: 9 Published on: 1, January, 1976

    Abstract: Illustrates the problems of Arun Deshpande, a young entrepreneur who held various patents of agricultural machines. He started developing his products, financed entirely by a nationalized bank. Later, he procured bridge finance from another bank, awaiting the sanction of a long term loan from a financial institution. Since this was ... More

  6. Ahmedabad Textiles Limited (B)

    Authors: Bijapurkar, Ashoke; Gupta, Subroto Sen; Mote, V L;

    Reference No: MAR0091(B) Pages: 15 Published on: 1, January, 1976

    Abstract: Describes the marketing strategy of a medium sized textile mill. The management's attitude towards advertising and consumer information systems is highlighted, and details about the role of the channel are provided. Decisions to be taken, relate to evaluating the promotion and distribution policies of the company in light of its ... More

  7. Modern Bakeries (I) Limited (P): Objectives and Accomplishments

    Authors: Murthy, K R S;

    Reference No: BP0071 Pages: 21 Published on: 1, January, 1976

    Abstract: Describes the process of formulation of objectives of Modern Bakeries, a public enterprise. Provides a good basis for evaluating the objectives and for discussing the accomplishments of the company with respect to its objectives. The objectives were formulated after the government accepted a recommendation by the Administrative Reforms Commission that ... More

  8. Long Range Planning in the Public Sector Steel Industry**

    Authors: Kulkarni, G R;

    Reference No: BP0095 Pages: 12 Published on: 1, January, 1976

    Abstract: The public sector steel companies in India represent an overwhelmingly dominant segment of the total steel industry of the country. As such, corporate long range planning assumes dimensions which almost seem to overlap with the task of national log range planni The case provides an introduction to the complexity of ... More

  9. Zeus India Limited

    Authors: Sachdeva, P S;

    Reference No: P&IR0086 Pages: 6 Published on: 1, January, 1976

    Abstract: The case deals with the linkages between recruitment systems, selection methods, placement decisions and evaluation of performance on completion of the probationary period. The need for systematic diagnosis and planning at each stage is highlighted so that the overall effectiveness of each officer/department can be improved. ... More

  10. Victor Gaskets India Limited (D)

    Authors: Ram Mohan, A V; Malya, M Meenakshi;

    Reference No: QM0101(D) Pages: 2 Published on: 1, January, 1976

    Abstract: The case deals with cost reduction measures through minimum utilization of raw material in a gasket making unit. The use of mathematical models and the need for information systems (linkages) can be illustrated through this series. The series has been designed to illustrate the process of identifying, formulating and solving ... More

Items 1876 to 1890 of 2718

per page

My Cart

You have no items
in your shopping cart.