Reference No: P&IR0031(B)Pages: 3Published on: 1, January, 1977
Abstract: Deals with the Graduate Engineer Training Scheme in TELCO's factory. The scheme started in 1967, was expected to supply bright and capable engineers to the new plant being set up. The scheme ran into several difficulties and had to be modified substantially between 1971 and 1974. Despite the modifications, the company was not ... More
Reference No: PSG0020TECPages: 4 Published on: 1, January, 1977
Abstract: The note outlines the steps that a branch of the Family Planning
Association of India would need to take in formulating a branch
study. This would require: 1) Defining the broad goals and objectives
of the branch in terms of services to be provided, client
segments, regional coverage, and channels to ... More
Reference No: F&A0297Pages: 3Published on: 1, January, 1977
Abstract: Presents a problem in the analysis of overhead variance. Variances have to be calculated based on the volume of output and the volume (labour hours worked). Finally, the controversy as to which of these two methods is right has to be resolved. ... More
Reference No: PROD0127TECPages: 2Published on: 1, January, 1977
Abstract: This note deals with problem of job design for employee motivation. This is particularly true of jobs that are highly monotonous, jobs with very low levels of skill requirements, etc. Among some recent experiments in job design, an approach that has reported some degree of success is job enrichment. This ... More
Reference No: QM0129(A)Pages: 32Published on: 1, January, 1977
Abstract: Case (A) discusses the drug distribution system in Uttar Pradesh. The problems being faced are presented, as also details of the existing records, information flow, and the way procurement, stocking and supply decisions have been made. The case also provides sampled data on demand and supply position in the past. ... More
Reference No: MAR0160TECPages: 69Published on: 1, January, 1977
Abstract: The note gives details of the cotton textile industry in India, relating to the product profile, industry structure, manufacturing process, distribution of textiles and the cost profitability and financial structure of the cotton textile industry in India. ... More
Reference No: BP0102Pages: 7Published on: 1, January, 1977
Abstract: The case traces the life of an individual who runs away from home, is employed as a domestic servant and enters industry. His interactions with top management and two different types of personnel managers, and his emergence and eclipse as a trade union leader are traced. ... More
Reference No: F&A0307Pages: 2 Published on: 1, January, 1977
Abstract: Deals with a problem in overhead cost variance. The excess consumption of steam in a spinning mill has to be analyzed into variances arising from 1) cost of producing steam, 2) hourly rate of supply of steam, 3) number of hours worked, and 4) efficiency of spinning. Requires logic rather than application of standard ... More
Reference No: PROD0134TECPages: 1 Published on: 1, January, 1977
Abstract: Illustrates the use of the multiple activity chart for balancing the activities of multiple machines. The example involves dumpers and a shovel used in the construction of a parking lot. The chart is similarly useful for balancing the activities of multiple men and machines in a man?machine operating system. ... More
Reference No: F&A0314Pages: 5 Published on: 1, January, 1977
Abstract: Deals with the use of relevant costs for analysis, and managerial decisions, in a joint product situation. Decisions involve choices between 1) alternative processes; 2) alternative uses of by product 3) new and old equipment; and 4) the activities to be pursued or dropped. Cost analysis could cover product line profitabilities and breakeven under ... More
Reference No: PROD0125TECPages: 2Published on: 1, January, 1977
Abstract: This note focuses on a job enrichment programme in the control room of a chemical plant. The operators have to follow operations carefully, adjust mix controls, monitor reactions, and record voluminous data on each batch process. As they have to adopt written standard operating procedures, the jobs are highly routine. ... More
Reference No: QM0123TECPages: 16Published on: 1, January, 1977
Abstract: Part- I describes basic methods of sorting records stored in the primary memory of a computer. Methods covered are distribution, distribution counting, radix, insertion, selection, merge insertion, bubble, shell and radix exchange sorts.Part- II covers advanced methods that are complex but efficient for sorting files residing in the main ... More
Reference No: ECO0237Pages: 13Published on: 1, January, 1977
Abstract: The case discusses how the passing of the Water (Prevention and Control of Pollution) Act affects the working of the smallscale chemical units located in the Industrial Estate at Nandesari. ... More