Reference No: PROD0029TECPages: 15Published on: 1, January, 1966
Abstract: Describes a modern well?organized and rationalized procedure for discovering unnecessary hidden costs. The effective use and orderly application of value engineering concepts through its three basic steps, seven phases of job plan and thirteen techniques have been discussed in detail. ... More
Reference No: F&A0019Pages: 23Published on: 1, January, 1966
Abstract: Deals with the control and reporting system in Hindustan Lever Limited. The relative contribution approach to management reporting is brought out in the case. ... More
Reference No: F&A0048(A)Pages: 12Published on: 1, January, 1966
Abstract: Deals with the problems that arose while converting deferred shares into ordinary shares for simplifying the corporate capital structure. The best legal, accounting and technical brains were engaged in resolving this problem. A firm stand had been taken by deferred and equity shareholders and they were to present their case ... More
Reference No: ECO0005(C)Pages: 7Published on: 1, January, 1966
Abstract: Deals with the problems of the longterm fare policy and profit planning of the transport undertaking. Students are to discuss and analyze the company's approach, and its assumptions and limitations. ... More
Reference No: CMA0085Pages: 5Published on: 1, January, 1966
Abstract: This case is on one of the aspects of functional management in dairying organisations viz. procurement. The specific aspect covered in this case is chilling of milk and its effect on reduction of sourage. An example of a village-level milk producers cooperative society is quoted. The incremental expenses of cooling ... More
Reference No: PROD0037Pages: 9 Published on: 1, January, 1966
Abstract: Describes how a manufacturing organization plans to introduce preventive maintenance procedures in its plant. The problems that are encountered while introducing preventive maintenance and the paperwork that is necessary are discussed. It also highlights the possible savings that could be made by the introduction of preventive maintenance in a large ... More
Reference No: P&IR0066(A)Pages: 7 Published on: 1, January, 1966
Abstract: Labour problems arising out of the closing down and shifting of one of the plants of a factory to a new location, issues pertaining to the union's objection to the discharge of surplus workmen and the company's legal position are discussed. ... More
Reference No: CMA0073Pages: 5Published on: 1, January, 1966
Abstract: Describes ways means of minimization of cost of fat testing at every procurement centre of a dairy. Different alternative systems of fat testing and their adoption by the village procurement centres are viewed from the point of view of cost minimization, rate of adoption, and practical difficulties to be faced ... More
Reference No: CMA0095Pages: 2Published on: 1, January, 1966
Abstract: The situation in the dairy relates to the problem of interpersonal relationships between the production manager the chief engineer of the plant. ... More