Filter By

Currently Shopping by:

  1. Remove This Item Sector: Infrastructure
Discipline
  1. Accounting (1)
  2. Finance (3)
  3. Operations Management (2)
  4. Public Policy and Law (1)
  5. Strategic Management (1)
Language
  1. English (2)
Product Type
  1. Case (4)

Search results for 'International finance cas'

per page
  1. Vizhinjam International Seaport Ltd (VISL)

    Authors: Sinha, Sidharth;

    Reference No: F&A0542 Pages: 23 Published on: 26, March, 2019

    Abstract: Government of Kerala, through its special purpose vehicle (SPV) - Vizhinjam International Seaport Ltd (VISL), intended to develop a deep-water Multipurpose Greenfield Port at Vizhinjam in Thiruvananthapuram, capital city of Kerala. After a decade of planning and several failed attempts, the proposed project was being offered for bidding as a ... More

  2. Greenko Plc

    Authors: Sinha, Sidharth;

    Reference No: F&A0527 Pages: 38 Published on: 18, January, 2016

    Abstract: Greenko is a renewable power generating company investing in biomass, small and medium hydro power and wind power projects. It was projected to achieve 1GW (Giga Watt=1000 Mega Watt) of installed capacity by March 2015. The company has been financing its projects with debt from Indian banks and financial institutions on ... More

  3. Voltas Limited (D): Finance

    Authors: Kuchhal, S C;

    Reference No: BP0144(D) Pages: 24 Published on: 1, January, 1983

    Abstract: Reviews the company's performance during a seven-year period--1974-75 to 1980-81. Voltas had resorted to certain operational strategies having significant financial implications: 1) it altered its method of calculating depreciation on its fixed assets; 2) it entered into foreign collaboration for its international operations; 3) it absorbed two of its affiliate companies with ... More

  4. International Builders Limited

    Authors: Haribhakti, Shailesh;

    Reference No: F&A0349 Pages: 3 Published on: 1, January, 1981

    Abstract: The basic elements of the control system initially envisaged by the company were 1) PERT/cost system to monitor project progress and related costs; 2) material and labour cost standards to form the basis of comparison with actuals; and 3) an overhead budget which identified the various manufacturing, finance, and administration overheads by ... More

per page

My Cart

You have no items
in your shopping cart.