Your search 'Logon Project' did not match any products.
Showing results using some of your search terms 'Logon Project'

Search results for 'Project'

per page
  1. Understanding Demand for Project Planning **

    Authors: Pathak, H N;

    Reference No: ECO0185TEC Pages: 7 Published on: 1, January, 1974

    Abstract: The note discusses the manner in which entrepreneurs understand and estimate or evaluate demand at the project planning stage. It largely discusses demand in terms of a few cases of projects. ... More

  2. Brackish Water Aquaculture Development Project

    Authors: Srivastava, U K; Dholakia, Bakul H; Nair, Ramachran G;

    Reference No: CMA0636 Pages: 25 Published on: 1, January, 1987

    Abstract: This is a comprehensive case for teaching the applications of all important concepts in financial and economic analysis of an agro-industrial project. The brackish water aquaculture development project consists of four components: 1) site selection for and construction of and management of ponds in each site; 2) site selection for and construction ... More

  3. Production Costing Software (PCS): A Software Reverse and Re-engineering Project

    Authors: Rao, V Venkata; Rama Rao, T P; Yegneshwar, S;

    Reference No: CISG0055 Pages: 16 Published on: 3, May, 1999

    Abstract: This case describes a software reverse and re-engineering project that Softco India has undertaken for Food Products International, Netherlands, through NRESI, Netherlands, owned by a non-resident Indian. ... More

  4. Indian Farmers' Fertilizer Cooperative Limited: Aonla Project and the HBJ Pipeline

    Authors: Shukla, P R; Tripathy, Arabinda; Thomas, P S;

    Reference No: PROD0195(A) Pages: 31 Published on: 1, January, 1985

    Abstract: In 1984, IFFCO was invited by the Government of India to establish a gas?based fertilizer plant on the Hazira? Bijyapur?Jagdishpur pipeline. The case describes the company's Aonla Project and the steps taken by IFFCO's project staff to implement it. Information about the pipeline project is also given along with ... More

  5. The Soil Health Card Project

    Authors: Vijaya Sherry Chand; Ravi, Jayanti S;

    Reference No: RJMC0022 Pages: 18 Published on: 13, June, 2012

    Abstract: The Commissionerate of Higher Education had motivated 55 science colleges to take up the Soil Health Card Project, a project of the Agriculture Department, under which 740,000 soil samples were tested in 2010. In 2011, there was a delay in obtaining approvals. The Commissionerate took some remedial steps and is about to obtain an ... More

  6. Urabian Airbus Project

    Authors: Balakrishnan, K;

    Reference No: QM0111 Pages: 12 Published on: 1, January, 1976

    Abstract: Deals with the problems associated with the introduction of five widebody Airbuses to replace a fleet of Turbo Props and Caravelles. As it is essential to synchronize the publicity campaign with the formal introduction of the Airbus, the management wants to know when the five aircraft will be ready ... More

  7. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  8. An Approach to Mobilizing Rural Labour: Pratappur Project (Part I)

    Authors: Gupta, Ranjit;

    Reference No: CMA0520 Pages: 2 Published on: 1, January, 1980

    Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More

  9. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  10. Dispute Resolution in an ROB Infrastructure Project (D)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(D) Pages: 3 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  11. A Note on Preparation of Feasibility Report of a Project

    Authors: Srivastava, U K;

    Reference No: CMA0465TEC Pages: 4 Published on: 17, October, 1978

    Abstract: The note deals with the purpose and content of the feasibility reports of a project and integrates various dimensions of information about an investment propose which needs to be put before the decision-making levels. ... More

  12. Mahanagar Milk Supply Scheme: Gokul Dairy Project (B)

    Authors: Sambrani, Shreekant; ;

    Reference No: CMA0309(B) Pages: 14 Published on: 17, October, 1974

    Abstract: The case discusses the application of performance budgeting to a large Adivasi rehabilitation-cum-milk production project undertaken by a state government. Various procedures and formats for obtaining performance budgets in the entire scheme have been discussed. ... More

  13. Simhadri Super Thermal Power Project (A)

    Authors: Pandey, Ajay; Morris, Sebastian;

    Reference No: ECO0350(A) Pages: 9 Published on: 26, December, 2006

    Abstract: The Indian electricity sector was opened to the private sector under the IPP policy. The NTPC, India's largest and perhaps most efficient generator had to respond to the changing scenario. It set out to set up the Simhadri project in Andhra Pradesh, going beyond to original mandate. The IPP policy, ... More

  14. Gujarat State Fertilizers Company Limited (A)

    Authors: Aggarwal, S C;

    Reference No: PROD0026(A) Pages: 10 Published on: 1, January, 1967

    Abstract: The case describes the application of PERT and CPM techniques to the project construction operations of a fertilizer plant in India. It indicates all the necessary steps, which must be taken before starting with the introduction of PERT, and how PERT helps in spotlighting troubles earlier. The student is expected ... More

Items 76 to 90 of 417

per page

My Cart

You have no items
in your shopping cart.