Reference No: PROD0310Pages: 29Published on: 31, March, 2016
Abstract: This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management , enforcement of safety rules , managing regulation iand in team building in leadership. A suitable case for ... More
Reference No: CIPR0008Pages: 16Published on: 20, October, 2010
Abstract: In February 2006, Engineers India Limited (EIL) which was hired by the Hindustan Petroleum Corporation Ltd (HPCL) had to submit their final report. The report had to evaluate whether a single point mooring or an additional jetty would be more viable for HPCL's increased crude import requirements through the Mumbai port. ... More
Reference No: PROD0152TECPages: 10Published on: 1, January, 1980
Abstract: ABC analysis is a basic tool for analysing the characteristics of a range of items at an aggregate level. In this note the applications of ABC analysis to two important areas of inventory management is considered:( 1 ) the estimation of aggregate inventory characteristics, and ( 2 ) designing individual item decision models using ABC ... More
Reference No: PROD0208Pages: 30Published on: 1, January, 1991
Abstract: Refrigerator Business Group (RBG), a division of Voltas Ltd., is producing 2.5 lakh refrigerators from its plant at Warora, Maharashtra. It has a licensed capacity of 5 lakh units and is planning to increase its production capacity. The firm has two options: to expand the existing plant at Warora or to set ... More
Reference No: CIPR0002Pages: 47Published on: 18, November, 2009
Abstract: Kolkata Port (KoPT) had achieved a turnaround from having made a loss of Rs 7.5 crores (cr) in the year 2000-01 to a net surplus of Rs 465.1 cr in the year 2006-07. A variety of initiatives had been taken during the intervening years with a focus on tariff rationalization, revenues from ... More
Reference No: PROD0313Pages: 11Published on: 14, April, 2016
Abstract: Raymond was lagging behind in their customer order fulfillment process due to inefficiencies in their warehouse operations. Further, slotting of stock keeping units to the right bins was not in order. As a result, the warehouse capacity was limiting company's growth. This case draws lessons about how warehousing technology and ... More
Reference No: PROD0327(C)Pages: 19Published on: 22, March, 2021
Abstract: This case deals with the project on establishing a rural piped water supply scheme in a village of Bihar. The Chief Engineer, Public Health Division, Patna, Bihar called his team members to have the fourth and final meeting to discuss the resource scheduling, materials management and the man-power requirements in ... More
Reference No: BP0286Pages: 14Published on: 23, January, 2003
Abstract: This case describes the tasks faced by Ranabir Mukherjee, recently appointed Vice President (Operations), in comprehending the operations of Cosmo Films, a company in the business of packing films, and developing a strategy and plans for enhancing effectiveness and efficiency. It presents the background of the company, the outcome of ... More
Reference No: PROD0204TECPages: 5Published on: 1, January, 1989
Abstract: This note introduces the features of expert systems and briefly discusses their applicability in the field of management. Expert systems aim to computerize the knowledge of one or more experts in a problem domain. Unlike in a decision support system, the overall direction for problem solving in an expert system ... More
Reference No: O&DS0006Pages: 21Published on: 25, November, 2024
Abstract: The centennial celebrations of Pramukh Swami Maharaj (1921-2016) were organized by BAPS at a massive scale, with more than 12.1 million visitors. The case looks at the event (PSM100) from a viewpoint of project management and identifies lessons related to design and execution of mega projects. PSM100 was simultaneously both mega ... More
Reference No: QM0223Pages: 13Published on: 1, January, 1992
Abstract: This case describes the running of passenger trains within the Vadodara division for which the crew needs to be organized. Since passenger trains are scheduled services, crew schedules can be developed in advance and are called as crew links. Various decisions can be evaluated like impact of various rest restrictions ... More
Reference No: BP0265Pages: 8Published on: 8, January, 2001
Abstract: This case describes the situation faced by the management of Torrent Gujarat Biotech Limited (TGBL), a company that was set up to manufacture Penecillin G, an antibiotic, in mitigating unexpected developments in the policy and competitive environment. The economics of the penicillin project changed drastically when the government liberalized the ... More
Reference No: QM0154Pages: 8 Published on: 1, January, 1979
Abstract: This case is concerned with setting up a relational data base management system for a hypothetical but realistic application. The application is to provide a query answering capability for a teaching institute for students, grades, courses and instructors. ... More