Reference No: CIPR0004(A)Pages: 36Published on: 23, March, 2010
Abstract: This case focuses on risk identification in the context of a railway Public Private Partnership (PPP) project. The perspective is that of a lender. The project was to provide broad gauge (BG) rail connectivity to Pipavav port from Surendranagar, over a distance of 265 kms. The case provides the salient features ... More
Reference No: CIPR0003(B)Pages: 35Published on: 8, January, 2010
Abstract: Towards the end of 90s, mounting losses forced Madhya Pradesh State Road Transport Corporation (MPSRTC), the sole provider of public transport in Madhya Pradesh, to suspend their urban services. As a consequence, organized public transport services ceased to exist in Indore, the largest metropolitan city of the state of Madhya ... More
Reference No: CIPR0003(A)Pages: 16Published on: 8, January, 2010
Abstract: Towards the end of 90s, mounting losses forced Madhya Pradesh State Road Transport Corporation (MPSRTC), the sole provider of public transport in Madhya Pradesh, to suspend their urban services. As a consequence, organized public transport services ceased to exist in Indore, the largest metropolitan city of the state of Madhya ... More
Reference No: CIPR0005Pages: 30Published on: 26, April, 2010
Abstract: This case focuses on the way forward for Hyderbad Metro Rail Ltd (HMRL) as of July 2009, when the earlier winning bidder had to be served with a termination notice due to non compliance towards financial closure. The top management of HMRL was considering various alternatives before them: 1) Whether the second ... More
Reference No: PSG0095Pages: 10Published on: 4, November, 2004
Abstract: Mhow Ghatabillod road was a critical link connecting growing industrial areas around Indore in Madhya Pradesh. The condition of the road was poor. There was an urgent need to improve the road. Madhya Pradesh State Industrial Development Corporation Limited decided to develop the project on a Build, Operate and Transfer ... More
Reference No: CIPR0011Pages: 39Published on: 11, August, 2011
Abstract: In February 2011, Mr Ajay Mittal, Chairman and Managing Director of Arshiya International Limited, had to decide a way forward for his rail container business following Ministry of Railways new circular on haulage. This circular, which levied commodity specific haulage in domestic segment, along with other conditions on siding usage had ... More
Reference No: PSG0084Pages: 11Published on: 24, October, 2002
Abstract: This case study discusses various issues in toll based BOT projects. L&T Transportation Infrastructure Limited (LTTIL), the BOT operator has been facing financial problems, experiencing a difficult time collecting tolls from the Athupalam Bridge segment of the Coimbatore Bypass project. Though LTTIL and the Government have been trying to ... More
Reference No: PSG0078Pages: 35Published on: 15, April, 1999
Abstract: Though philanthropic activities are age old, in recent times, private service institutions have been acknowledged, both, by the people and the state, for the service they render. However, the accountability of such institutions is yet to be explored, from a service point of view. Though it will not add directly ... More
Reference No: F&A0339(C)Pages: 44 Published on: 1, January, 1980
Abstract: Analyses, interprets and illustrates many aspects of the concepts and practices of financial management. The case facilitates discussion of: 1) conversion of a private limited company into a public limited company; 2) public issue; 3) stock exchange listing; 4) cost of capital; 5) capital expenditure planning; 6) capital structure planning; 7) analysis of business and financial risks ... More
Reference No: F&A0339(D)Pages: 32 Published on: 1, January, 1980
Abstract: Analyses, interprets and illustrates many aspects of the concepts and practices of financial management. The case facilitates discussion of: 1) conversion of a private limited company into a public limited company; 2) public issue; 3) stock exchange listing; 4) cost of capital; 5) capital expenditure planning; 6) capital structure planning; 7) analysis of business and financial risks ... More
Reference No: CIPR0001(B)Pages: 9Published on: 1, December, 2006
Abstract: Banks have an important role to play in infrastructure development in India through project financing. The case deals with the risks associated with a government led transport infrastructure project from lenders perspective. A large public bank has to decide on financing the bus rapid transit system (BRTS) proposed for Ahmedabad. ... More
Reference No: CIPR0001(A)Pages: 14Published on: 1, December, 2006
Abstract: The government has created an environment for rapid development to take place in infrastructure. However, managing the involvement of private partners as well as providing firm regulation requires institutions. Local governments at the city level have little experience in managing this process. This case uses the bus rapid transit system ... More
Reference No: PSG0087Pages: 19Published on: 24, April, 2003
Abstract: Australia Post (AP) is faced with the issue of continuance of its monopoly status in the standard letter category, and the pressures of meeting social obligations, while ensuring profitability. This case looks into the organizational set up of AP, the different services offered by AP, and an idea of its ... More
Reference No: PSG0098(A)Pages: 44Published on: 5, April, 2006
Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More
Reference No: RJMC0021Pages: 16Published on: 13, June, 2012
Abstract: The Chief Executive Officer of SCOPE (Society for Creation of Opportunity through Proficiency in English) has to decide which of two models, a public-private partnership model which trained interested youth in the language and certified them, or an Only Assessment Scheme, which only tested and certified candidates, needed to receive ... More