Catalog Advanced Search

15 item(s) were found using the following search criteria
  • Authors: Narayanan, N

Don't see what you're looking for? Modify your search

per page
  1. Capacity Tangle

    Authors: Kalro, A H; Issac, Akkanad M; Narayanan, N;

    Reference No: QM0104 Pages: 8 Published on: 1, January, 1977

    Abstract: Deals with the problem of establishing the aggregate production capacity of a small ceramics shop which manufactures a variety of ceramic articles. The case describes the production process, including the equipment used, and details of the various products manufactured (such as the number of articles per set, sizes, weights, number ... More

  2. Simha Airlines: Aircraft Maintenance Scheduling

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0208 Pages: 11 Published on: 1, January, 1987

    Abstract: The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time taken for project completion. Most of the activities have single time estimates, while a few activities have three time estimates. ... More

  3. Indian Airlines: Caravelle Inventories

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0210 Pages: 15 Published on: 1, January, 1988

    Abstract: The case describes inventory-planning policies followed by Indian Airlines for preventive maintenance of its fleet of Caravelle aircraft that is on the verge of technological obsolescence. The objective is to determine whether the present inventory policies regarding: 1) classification of items, 2) system of stock review and replacement, 3) lead time analysis, and 4) ... More

  4. Indian Airlines: Caravelle Maintenance Planning

    Authors: Kalro, A H; Narayanan, N;

    Reference No: QM0211 Pages: 5 Published on: 1, January, 1988

    Abstract: The case depicts a maintenance planning and scheduling problem for the Caravelle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are described. The objective is to develop preventive maintenance schedules to ensure proper utilization of the available ... More

  5. Technology Planning and Choices **

    Authors: Narayanan, N; Satia, J K;

    Reference No: PROD0110TEC Pages: 12 Published on: 1, January, 1976

    Abstract: Defines technology planning, and enumerates on the manager's role, types of technology changes, technological forecasting, mechanism of technology transfer, and technological strategy. ... More

  6. Acceptance Sampling: An Application

    Authors: Narayanan, N; Korgaonker, M G; Kalro, A H;

    Reference No: PROD0165 Pages: 3 Published on: 1, January, 1980

    Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More

per page

My Cart

You have no items
in your shopping cart.