Reference No: F&A0087Pages: 3 Published on: 1, January, 1977
Abstract: This is a case in comprehensive variance analysis. Requires computation of material, labour, and variable and fixed overheads in a process-costing situation. Variances have to be worked out on equivalent units of production rather than on just finished goods. ... More
Reference No: F&A0312(A)Pages: 3Published on: 1, January, 1977
Abstract: An introductory problem in process costing, covering four processes and three products. Introduces the concepts of transferred-in costs and equivalent units. Excludes treatment of opening work-in-process and losses. ... More
Reference No: MAR0192Pages: 7Published on: 1, January, 1977
Abstract: The case describes the salient features of the fork lift truck (FLT) industry. Saptrishi has been losing several key orders to its competitor, Aquarius. A market research study finds out how FLTs are bought. The data should help in understanding the buyer behaviour, leading to a more effective segmentation and ... More
Reference No: F&A0302Pages: 2 Published on: 1, January, 1977
Abstract: Outlines a process-costing problem to illustrate the treatment of normal loss and abnormal loss. Does not cover abnormal gain. Also involves treatment of equivalent units of loss and closing work-in-process. ... More
Reference No: MAR0161Pages: 8 Published on: 1, January, 1977
Abstract: A large multidivision, multinational company based in Chicago forms a new Product Analysis Group. This group is to screen new product proposals emanating from various divisions. A complex set of criteria has to be satisfied. ... More
Reference No: ECO0243Pages: 8Published on: 1, January, 1977
Abstract: This case presents the problems in business policy of a smallscale manufacturer of the hubs for bicycles. The problems faced in export marketing by this unit are treated in the framework of the total market for the product. Special focus is put on the linkages between allocating the output ... More
Reference No: P&IR0031(B)Pages: 3Published on: 1, January, 1977
Abstract: Deals with the Graduate Engineer Training Scheme in TELCO's factory. The scheme started in 1967, was expected to supply bright and capable engineers to the new plant being set up. The scheme ran into several difficulties and had to be modified substantially between 1971 and 1974. Despite the modifications, the company was not ... More
Reference No: QM0104Pages: 8Published on: 1, January, 1977
Abstract: Deals with the problem of establishing the aggregate production capacity of a small ceramics shop which manufactures a variety of ceramic articles. The case describes the production process, including the equipment used, and details of the various products manufactured (such as the number of articles per set, sizes, weights, number ... More
Reference No: QM0130Pages: 9Published on: 1, January, 1977
Abstract: Deals with problems in statistical quality control, especially process control and acceptance sampling, in a large engineering company. ... More
Reference No: OB0055Pages: 6Published on: 1, January, 1977
Abstract: Life story of an entrepreneur, with emphasis on the process of establishing the enterprise and its management. Illustrates several behavioural dimensions of entrepreneurs. ... More
Reference No: F&A0310Pages: 3Published on: 1, January, 1977
Abstract: Gives the breakup of cost of production of sulphuric acid for a medium-scale manufacturer in 1966. Details are given in terms of actual totals for three chosen months, and estimated per unit costs for 1967. Variability of costs are not given. Students are expected to discern the behaviour of costs from ... More
Reference No: QM0117(B)Pages: 11Published on: 1, January, 1977
Abstract: The professors send a proforma in which data should be collected. The dalal expresses some doubts about the usefulness of the data requested. The professors clarify these doubts, and receive the data needed for the analysis. The case ends with all the information needed to make product-wise decisions for ... More