Reference No: P&IR0003Pages: 23Published on: 1, January, 1980
Abstract: The Administrative Reforms Commission recommended that the personnel function in public enterprises should be strengthened. In a number of organizations, what was once a record keeping, welfare and IR-oriented department, the Personnel Department has become proactive, professional and progressive. This case is an attempt at understanding the evolution of the ... More
Reference No: QM0203Pages: 13Published on: 1, January, 1985
Abstract: Presents a problem the Indian Railways faces in deciding to introduce superfast trains. It illustrates the need for a simulation analysis in a complex situation. ... More
Reference No: F&A0370Pages: 5 Published on: 1, January, 1985
Abstract: Highlights the determination of cash flows for investment analysis. Its main focus is on the treatment of interest on debt in computing projects' cash flows. ... More
Reference No: BP0195Pages: 16Published on: 1, January, 1987
Abstract: The case deals with Ashok Leyland's expansion plans in two new locations in the context of the changing environmental conditions. Data on the company's products, performance, overall industry demand, competition, and new entrants are given to enable students to evaluate the expansion plan of Ashok Leyland and to decide whether ... More
Reference No: QM0208Pages: 11 Published on: 1, January, 1987
Abstract: The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time taken for project completion. Most of the activities have single time estimates, while a few activities have three time estimates. ... More
Reference No: QM0211Pages: 5 Published on: 1, January, 1988
Abstract: The case depicts a maintenance planning and scheduling problem for the Caravelle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are described. The objective is to develop preventive maintenance schedules to ensure proper utilization of the available ... More
Reference No: PSG0054Pages: 50 Published on: 1, January, 1988
Abstract: This is a comprehensive case that looks at an urban road transport undertaking. It traces the growth of the organization by examining the major decisions of the past chief executives. The current status of the organization and the key corporate level decisions that need to be taken are presented. ... More
Reference No: QM0213Pages: 21 Published on: 1, January, 1988
Abstract: Computerization of the Passenger Reservation System (PRS) is a key strategy in the corporate plan (1985- 2000) of the Indian Railways. As a part of this strategy, computerized PRS had been implemented in Delhi, Madras, Bombay and Calcutta by the end of 1988. The PRS in the secondlevel cities of Hyderabad, ... More
Reference No: QM0210Pages: 15Published on: 1, January, 1988
Abstract: The case describes inventory-planning policies followed by Indian Airlines for preventive maintenance of its fleet of Caravelle aircraft that is on the verge of technological obsolescence. The objective is to determine whether the present inventory policies regarding: 1) classification of items, 2) system of stock review and replacement, 3) lead time analysis, and 4) ... More
Reference No: PSG0055Pages: 20 Published on: 1, January, 1989
Abstract: This case describes the organizational form and structure of passenger road transport undertakings in Tamil Nadu. Since nationalization in 1971, major decisions regarding the organizational form were taken. Road transport undertakings were set up in Tamil Nadu under the Companies Act, which is supposed to be RTC Act (which was the ... More