Reference No: CMA0470Pages: 5Published on: 20, January, 1979
Abstract: The case Provides material for discussing how the R.B.I ?s Policies Related to short tame credit for agriculture marketing can affect business of cotton cooperative ... More
Reference No: CMA0479Pages: 12Published on: 4, July, 1979
Abstract: The case identifies the characteristics of commercial poultry entrepreneurs in relation to their socio-economic characteristics, managerial skills, etc. It also studies the input structure of egg production and the relationship between input and output. An identification of marketing channels has been covered. ... More
Reference No: CMA0477Pages: 6Published on: 9, July, 1979
Abstract: Describes the issues related to a grassroot level weavers organization, with special reference to expenditure sharing among the member weavers. The case raises the problems of internal group dynamics and the external system. ... More
Reference No: CMA0476Pages: 5Published on: 9, July, 1979
Abstract: Describes the traditional business practices in the unorganized/decentralized handloom sector with special reference to the master-weavers system. The managerial need to protect the human needs of the weavers through organization interventions are the basic issues raised in the case. ... More
Reference No: CMA0386Pages: 10Published on: 13, December, 1979
Abstract: Gambhirpura Collective Farming Society was formed in 1953. Within two years, the society ran into problems. In the general body meeting, the Chairman listed the problems faced by the society and stated that the members could improve their economic conditions if they could identify an operational solution to involve all the ... More
Reference No: PROD0164Pages: 3Published on: 1, January, 1980
Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More
Reference No: PROD0160Pages: 4Published on: 1, January, 1980
Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More