Filter By

Currently Shopping by:

  1. Remove This Item Sector: Infrastructure
  2. Remove This Item Discipline: Public Policy and Law
Language
  1. English (12)
Product Type
  1. Case (13)
  2. Technical Note (5)

Most Popular cases

List of Most Popular Cases

  1. Airports Economic Regulatory Authority of India: Fair Rate of Return for Airports

    Authors: Sinha, Sidharth;

    Reference No: F&A0536 Pages: 27 Published on: 29, March, 2017

    Abstract: An estimate of the fair rate of return on capital is a critical input into tariff regulation. A too high estimate will lead to high tariffs for consumers; a too low estimate will not provide adequate incentives for investment. The Airport Economic Regulatory Authority of India has issued a consultation ... More

  2. Endless Choices in an Investors' Paradise: Togo

    Authors: Mathur, Ajeet;

    Reference No: ECO0356 Pages: 35 Published on: 3, March, 2016

    Abstract: The case describes how Togo was devastated by a combination of poor public policy and risk-averse foreign investors. The case provides a setting for the study of both Country Risk and Political Risk from the perspective of multilateral aid development financing agencies, foreign investors and citizens in a developing country ... More

  3. The Yamuna Expressway

    Authors: Raghuram, G; Mehta, Pranav;

    Reference No: CIPR0009 Pages: 39 Published on: 18, May, 2011

    Abstract: It was December 13, 2010. The Government of Uttar Pradesh announced their plan to urbanize the entire area along the Yamuna Expressway (YE) in order to prevent haphazard growth of urban sprawls on the flanks of the YE. The YE was conceived in 1997 as a dream project of Ms Mayawati, the then ... More

  4. Mormugao Port Trust and South West Port

    Authors: Raghuram, G; Gangwar, Rachna;

    Reference No: CIPR0006 Pages: 13 Published on: 26, April, 2010

    Abstract: It was June 2008. The conflicts between Mormugao Port Trust (MoPT) and South West Port Limited (SWPL) on coal/coke handling once again surfaced following a report submitted by the National Environmental Engineering Research Institute (NEERI) concluding that residents of Vasco city near the port were inhaling coal pollution much beyond ... More

  5. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  6. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  7. Dispute Resolution in an ROB Infrastructure Project (D)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(D) Pages: 3 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  8. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  9. The Case of the Dying Fish

    Authors: Gopalkrishnan, C; Rao, Sreenivas S;

    Reference No: BP0143 Pages: 16 Published on: 1, January, 1979

    Abstract: Zuari Agro Chemicals Limited, designed, engineered, and constructed by one of the most experienced engineering organizations in the world, and employing the most modern technology for producing chemical fertilizers, faced a closure threat immediately after a few months of starting operations when the effluent discharged by the plant, polluted water ... More

  10. Hind Cycles Limited (AR)**

    Authors: Nambudiri, C N S; Raman, K S;

    Reference No: BP0055 Pages: 48 Published on: 1, January, 1974

    Abstract: Discusses the operational problems faced by the first company set up to manufacture complete bicycles in India; illustrates how the pricing policy (to fight competition from imported cycles) and higher wage structure became detrimental to the survival of the company; and brings out the policy of tariff protection and other ... More

Items 1 to 15 of 19

per page

My Cart

You have no items
in your shopping cart.