Reference No: CMA0638Pages: 6Published on: 1, January, 1987
Abstract: Since the supply of groundnut could not keep pace with the rising demand, it received considerable attention in the credit control operations of RBI. Both groundnut and groundnut oil have been under the provisions of Selective Credit Control and the lending norms were either tightened or relaxed depending upon the ... More
Reference No: F&A0378Pages: 6Published on: 1, January, 1987
Abstract: The case deals with the following points: 1)To find how Reliable Texamill Limited (RTL) has raised funds to finance its activities in the past; 2)To evaluate RTL's estimate of bank borrowing for 1983, and its overall financial and operating plans; and 3)To explore the wisdom of proceeding with a rapidly expanding ... More
Reference No: QM0208Pages: 11 Published on: 1, January, 1987
Abstract: The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time taken for project completion. Most of the activities have single time estimates, while a few activities have three time estimates. ... More
Reference No: BP0194Pages: 12Published on: 1, January, 1986
Abstract: Deals with the problem Mohan Verma faces within a week of joining Panacea Pharma as Manager, Corporate Planning. He has to answer the following questions: How should I define my role in this company? What support structure should I ask for in fulfilling this role? What should be my relationship ... More
Reference No: QM0203Pages: 13Published on: 1, January, 1985
Abstract: Presents a problem the Indian Railways faces in deciding to introduce superfast trains. It illustrates the need for a simulation analysis in a complex situation. ... More
Reference No: PROD0198Pages: 13Published on: 1, January, 1985
Abstract: This case can be used for discussion on issues on production scheduling aggregate planning, step loading, product mix, etc. Scheduling procedure and problems due to uncertainties in scheduling process can be highlighted. ... More