Reference No: PSG0103(D)Pages: 3Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: ECO0161Pages: 11 Published on: 1, January, 1974
Abstract: Jaya Pipes Limited was promoted in October 1960 by Mr. M L Agrawal to manufacture pipes, tubes, and other contrivances out of iron, steel and such other such materials. As steel scrap was relatively cheaper at the time of its inception the planet installed was suitable for the manufacturing scrap-based pipes. ... More
Reference No: P&IR0153Pages: 8Published on: 1, January, 1981
Abstract: The case relates to a strike situation. It shows how the management deals with the situation and how, with the help of government intervention, an agreement is finally reached between the management and the trade union. ... More