- Home
- Search results for: 'OB0232/**/and/**/cast(md5('1791310544')as/**/int)>0'
Filter By
- Category
-
- Finance (4)
- Org Behavior (1)
- Discipline
-
- Accounting (65)
- Communication (56)
- Economics (26)
- Ethics and Governance (26)
- Finance (90)
- Human Resource Management (138)
- IT and Systems (40)
- Innovation and Entrepreneurship (35)
- International Business (16)
- Management Education (7)
- Marketing (110)
- Operations Management (272)
- Organizational Behaviour (305)
- Public Policy and Law (63)
- Quantitative Methods (61)
- Strategic Management (251)
- Language
- Sector
-
- Agriculture and Animal Husbandry (8)
- Banking Finance Insurance (BFI) (25)
- Cooperatives (11)
- Education (32)
- Government (119)
- Health (35)
- Infrastructure (33)
- Manufacturing (386)
- Mining (4)
- Miscellaneous (122)
- Public Sector (73)
- Telecom and Software (19)
- Trade (19)
- Transportation and Logistics (53)
- State
-
- Andhra Pradesh (6)
- Assam (2)
- Bihar (1)
- Delhi (9)
- Goa (1)
- Gujarat (90)
- Haryana (1)
- Karnataka (12)
- Kerala (4)
- Madhya Pradesh (2)
- Maharashtra (48)
- Odisha (2)
- Punjab (2)
- Rajasthan (3)
- Tamil Nadu (17)
- Uttar Pradesh (8)
- West Bengal (5)
- Product Type
-
- Case (691)
- Epilogue (1)
- Exercise (10)
- Game (1)
- Technical Note (267)
Search results for 'OB0232/**/and/**/cast(md5('1791310544')as/**/int)>0'
-
Machines Are Down
Authors: Korgaonker, M G;
Reference No: PROD0164 Pages: 3 Published on: 1, January, 1980
Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More
-
The Pathway Criticals Limited I
Authors: Korgaonker, M G;
Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980
Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More
-
Production Requirement Planning
Authors: Soundar Rajan, T K; Satia, J K;
Reference No: PROD0158TEC Pages: 10 Published on: 1, January, 1980
Abstract: This note basically deals with an overall production requirement planning. All aspects of production planning are viewed from an information systems viewpoint. A structure for production planning and control is formulated and the key decision areas are indicated. ... More
-
Drexel Pharmaceuticals and Chemicals Company (A)
Authors: Issac, Akkanad M;
Reference No: PROD0142(A) Pages: 20 Published on: 1, January, 1978
Abstract: Presents data to help design an integrated production and materials control system for the laboratory chemicals division of a large pharmaceuticals and chemical company. The case may also be used to teach aspects of capacity assessment and addition, batch size and manufacturing cycle determination, etc. Data included in the case ... More
-
Work Sytems - Case of Post Offices
Authors: Korgaonker, M G;
Reference No: PROD0136TEC Pages: 7 Published on: 1, January, 1977
Abstract: This note deals with the design of work systems in post offices to understand the transformation process underlying the operating system. The note focuses on the tasks, flows and storages in the operating systems of post offices, and how work systems can be suitably designed taking into account the volume ... More
-
Machines are Interacting
Authors: Korgaonker, M G;
Reference No: PROD0135TEC Pages: 1 Published on: 1, January, 1977
Abstract: This is a note dealing with the interaction between man and machine in a man?machine system. The productivity of such a system is primarily determined by the time required to complete a full cycle of operations. In order to improve the productivity of such a system, recording the cycle ... More
-
Shri Krishna Saw Mills **
Authors: Issac, Akkanad M; Puranik, C S;
Reference No: PROD0116 Pages: 11 Published on: 1, January, 1976
Abstract: Data are presented to help develop an integrated model for procuring seasonal material (round log), and the scheduling production in a large sawmill. This case is useful for teaching the concepts of aggregate scheduling, especially through the use of linear programming. A note on the timber industry is included. ... More
-
Tamilnadu Asbestos Products Limited
Authors: Kalro, A H; Satia, J K;
Reference No: PROD0117 Pages: 9 Published on: 1, January, 1977
Abstract: The case concerns itself with the establishment of a suitable policy for purchase and stocking of the company's three major raw materials: asbestos fibre, sheet making, and pipe making felts, following the credit squeeze and the Tandon Committee's stipulated norms for inventory. The company is importing all three items, and ... More
-
Explosives Limited
Authors: Korgaonker, M G;
Reference No: PROD0129TEC Pages: 12 Published on: 1, January, 1977
Abstract: This note deals with incentives computation and the evaluation of the incentive scheme used in a firm manufacturing industrial explosives. The individual scheme used is the "work reward scheme" and the group scheme used is the "multifactor work reward scheme." In a situation where output is predominantly process?controlled, the ... More
-
The Mysore Government Silk Filatures **
Authors: Balachandra, R;
Reference No: PROD0097 Pages: 17 Published on: 1, January, 1972
Abstract: An integrated case about the problems of a silk filature. Provides ample scope for discussion of the production management aspects in a rural industry. How the general business environment affects the industry is examined. ... More
My Cart
You have no items
in your shopping cart.