Reference No: PSG0103(A)Pages: 48Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: CISG0042(B)Pages: 5 Published on: 19, November, 1998
Abstract: Indian Railways is the world's second largest railway system under a single management, and the largest in Asia. IR has a regular work-force of 1.6 million employees. Its fleet of rolling stock includes over 9000 locomotives, 30,000 passenger cars (coaches), and 350,000 freight cars. IR is a multi-gauge multi-traction system, covering over 100,000 km of ... More
Reference No: PROD0328Pages: 17Published on: 21, September, 2020
Abstract: Aries Agro, an agribusiness firm, faced two prime challenges – the safety and productivity of its workers. When traditional software systems fell short of addressing these challenges, the firm contemplated the implementation of an IoT (Internet of things) based solution. This IoT based solution captures the movement of workmen and generates ... More
Reference No: PSG0103(D)Pages: 3Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: QM0277Pages: 13Published on: 29, March, 2017
Abstract: The case describes the hardships faced by Dr. Swati Bhargava, an academician when she was stranded in Kathmandu, Nepal after an earthquake in April 2015. The Kathmandu airport was closed for operations after the earthquake. Even though Dr. Bhargava had a confirmed ticket to Ahmedabad via Delhi from Kathmandu by an ... More
Reference No: PSG0103(B)Pages: 26Published on: 27, March, 2008
Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More
Reference No: O&DS0007(B)EXPages: 4Published on: 6, January, 2025
Abstract: Shruti, the Production Manager at SYS Fertilizers, is drafting a budget to optimize profits for nitric acid plant. SYS Fertilizers produce nitric acid in three concentrations, i.e. 60%, 68%, and 98%. Prices vary for each concentration and distribution channel via tankers, containers, and pipelines.
Shruti's challenge is to strategise a plan aligning ... More
Reference No: CISG0065Pages: 3Published on: 16, April, 2001
Abstract: GSM Private Limited is commissioning a port equipment system at the outer ore berth at Vishakapatnam (Vizag) port, designed to handle import of bulk commodities like cooking coal, fertilizers, and fertilizer raw materials. The project aims to deliver substantial benefits through economies of scale, resulting from the port's ability to ... More
Reference No: COMM0012Pages: 11Published on: 16, November, 2015
Abstract: The Brand Ambassador campaign was launched in Hyderabad on January 8, 2013 with the intent to bring awareness and dispel negativity about the Metro Rail project. A two-year review in 2015 revealed that although many of the initial problems had been overcome, and negativity considerably reduced, the campaign had only achieved partial sucess. ... More
Reference No: PSG0098(A)Pages: 44Published on: 5, April, 2006
Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More
Reference No: CISG0042(A)Pages: 3Published on: 24, October, 1996
Abstract: In this case, an MIS for the utilization of passenger cars and locomotives in the Indian Railways is discussed. The existing system of utilization is discussed, and the inadequacy of the performance indicators brought out. We then define new indicators of performance, and demonstrate how these indicators are useful in ... More
Reference No: O&DS0009Pages: 29Published on: 31, October, 2025
Abstract: Blubirch offered reverse supply chain solutions by automating return processing, improving quality grading and offering an auction marketplace for remarketing of returned products. The increasing trend of customers ordering more items than needed from online marketplaces, so that they could try out the items in the convenience of the home ... More
Reference No: CIPR0007(B)Pages: 18Published on: 6, July, 2010
Abstract: In October 2005, the representatives of the Planning Commission, Ministry of Railways, Ministry of Commerce and Industry, and Ministry of Shipping met to discuss the RITES recommendations to work towards framing a policy document for running container trains by private and public sector operators on the IR network. Starting with this ... More
Reference No: ECO0005(E)Pages: 9Published on: 1, January, 1967
Abstract: To analyze the cost behaviour and operating efficiency of AMTS in light of the general manager's observations and the supporting data on fare revision. To present arguments for or against fare revision. A note on transport industry terminology is required. ... More
Reference No: MAR0321Pages: 29Published on: 3, May, 1999
Abstract: Konkan Railway Corporation Limited (KRC) was set up as a Public Sector company under the Ministry of Railways in July 1990 to bridge the 738 km "Konkan Gap" by providing a railway connection between Roha (150 kms South of Mumbai) and Thokur (about 22 kms North of Mangalore). KRC completed the project at a ... More