  1. Machines Are Down

    Authors: Korgaonker, M G;

    Reference No: PROD0164 Pages: 3 Published on: 1, January, 1980

    Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More

  2. The Pathway Criticals Limited I

    Authors: Korgaonker, M G;

    Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980

    Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More

  3. Production Requirement Planning

    Authors: Soundar Rajan, T K; Satia, J K;

    Reference No: PROD0158TEC Pages: 10 Published on: 1, January, 1980

    Abstract: This note basically deals with an overall production requirement planning. All aspects of production planning are viewed from an information systems viewpoint. A structure for production planning and control is formulated and the key decision areas are indicated. ... More

  4. Drexel Pharmaceuticals and Chemicals Company (A)

    Authors: Issac, Akkanad M;

    Reference No: PROD0142(A) Pages: 20 Published on: 1, January, 1978

    Abstract: Presents data to help design an integrated production and materials control system for the laboratory chemicals division of a large pharmaceuticals and chemical company. The case may also be used to teach aspects of capacity assessment and addition, batch size and manufacturing cycle determination, etc. Data included in the case ... More

  5. Work Sytems - Case of Post Offices

    Authors: Korgaonker, M G;

    Reference No: PROD0136TEC Pages: 7 Published on: 1, January, 1977

    Abstract: This note deals with the design of work systems in post offices to understand the transformation process underlying the operating system. The note focuses on the tasks, flows and storages in the operating systems of post offices, and how work systems can be suitably designed taking into account the volume ... More

  6. Machines are Interacting

    Authors: Korgaonker, M G;

    Reference No: PROD0135TEC Pages: 1 Published on: 1, January, 1977

    Abstract: This is a note dealing with the interaction between man and machine in a man?machine system. The productivity of such a system is primarily determined by the time required to complete a full cycle of operations. In order to improve the productivity of such a system, recording the cycle ... More

  7. Shri Krishna Saw Mills **

    Authors: Issac, Akkanad M; Puranik, C S;

    Reference No: PROD0116 Pages: 11 Published on: 1, January, 1976

    Abstract: Data are presented to help develop an integrated model for procuring seasonal material (round log), and the scheduling production in a large sawmill. This case is useful for teaching the concepts of aggregate scheduling, especially through the use of linear programming. A note on the timber industry is included. ... More

  8. Tamilnadu Asbestos Products Limited

    Authors: Kalro, A H; Satia, J K;

    Reference No: PROD0117 Pages: 9 Published on: 1, January, 1977

    Abstract: The case concerns itself with the establishment of a suitable policy for purchase and stocking of the company's three major raw materials: asbestos fibre, sheet making, and pipe making felts, following the credit squeeze and the Tandon Committee's stipulated norms for inventory. The company is importing all three items, and ... More

  9. Explosives Limited

    Authors: Korgaonker, M G;

    Reference No: PROD0129TEC Pages: 12 Published on: 1, January, 1977

    Abstract: This note deals with incentives computation and the evaluation of the incentive scheme used in a firm manufacturing industrial explosives. The individual scheme used is the "work reward scheme" and the group scheme used is the "multifactor work reward scheme." In a situation where output is predominantly process?controlled, the ... More

  10. The Mysore Government Silk Filatures **

    Authors: Balachandra, R;

    Reference No: PROD0097 Pages: 17 Published on: 1, January, 1972

    Abstract: An integrated case about the problems of a silk filature. Provides ample scope for discussion of the production management aspects in a rural industry. How the general business environment affects the industry is examined. ... More