  1. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (B)

    Authors: Dutta, Goutam; Sarkar, Debasis;

    Reference No: PSG0144(B) Pages: 17 Published on: 27, April, 2022

    Abstract: The case discusses the detailed microplanning of the risk sources for the PMRC underground corridor metro project. The client, Progressive Metro Rail Corporation was a public sector company floated jointly by the State and Central Government. The principal contractor was a Joint Venture (JV) of five contractors — three foreign and ... More

  2. Development of Project Risk Management System for Progressive Metro Rail Corporation in the National Capital of Emerging Asian Economy (A)

    Authors: Dutta, Goutam; Sarkar, Debasis; Viswanath, Ashna;

    Reference No: PSG0144(A) Pages: 19 Published on: 27, April, 2022

    Abstract: The case discusses the situation of Mr. Madhavan, Managing Director of the Progressive Metro Rail Corporation, following the mayhem at the construction site of the metro. He has to submit a comprehensive risk management system to the Chief Minister and the cabinet ministers. Before developing a risk management system, it ... More

  3. Making Metro Rail Work in Developing Countries: Overcoming Ridership and Financial Management Challenges

    Authors: Chakrabarti, Sandip; Verma, Muskan;

    Reference No: CTL0006 Pages: 32 Published on: 19, May, 2025

    Abstract: Against the backdrop of India’s unprecedented investments in urban and regional rail-based mass transportation systems, this case introduces Ms. Anuradha Dey, the Managing Director (MD) of a major Metro Rail Corporation, who is leading a major metro rail construction program in a medium-sized city of India. Ms. Dey is ... More

  4. Dispute Resolution in an ROB Infrastructure Project (C)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(C) Pages: 10 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  5. Project Financing for Sustainable Railways Project

    Authors: Garg, Amit; Beri, Pramod; Kasliwal, Siddhi;

    Reference No: PSG0132 Pages: 8 Published on: 18, March, 2020

    Abstract: The government is considering a semi high-speed rail project to tackle some of the current issues associated with the public transportation system in the proposed area. Given the hilly terrain of the area, the current means of transportation are very slow and unreliable. Several studies had shown that the lack ... More

  6. Dispute Resolution in an ROB Infrastructure Project (D)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(D) Pages: 3 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  7. Dispute Resolution in an ROB Infrastructure Project (B)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(B) Pages: 26 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  8. Dispute Resolution in an ROB Infrastructure Project (A)

    Authors: Venkataraman, Krishnan;

    Reference No: PSG0103(A) Pages: 48 Published on: 27, March, 2008

    Abstract: The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion in September 2001. However, due to a variety of causes, the process was delayed and the ... More

  9. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  10. The Kandla-Bhatinda Pipeline Controversy

    Authors: Manikutty, S; Raghuram, G;

    Reference No: PSG0067 Pages: 27 Published on: 23, February, 1994

    Abstract: This case emphasizes the decision making process of infrastructure investments for the two modes of transportation of petroleum products between Kandla Port and North West India. Indian Oil Corporation made a proposal in 1981 for a new pipeline between Kandla and Bhatinda, in order to cater to the increased projected traffic ... More

  11. Cochin International Airport Limited (A)

    Authors: Varkkey, Biju; Raghuram, G;

    Reference No: PSG0098(A) Pages: 44 Published on: 5, April, 2006

    Abstract: Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which was not capable of handling wide-bodied aircraft due to runway limitations. The Cochin airport project throws up ... More

  12. Navi Mumbai International Airport

    Authors: Raghuram, G;

    Reference No: CIPR0010 Pages: 44 Published on: 13, July, 2011

    Abstract: The case focuses on the problems of getting environmental clearance for the Navi Mumbai International Airport (NMIA). While the concept of a second airport for Mumbai began as early as 1995, the planning began more actively in 2007, after the modernisation process of the existing airport was put in place. The NMIA ... More