Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
Language
  1. English (51)
Sector
  1. Agriculture and Animal Husbandry (9)
  2. Banking Finance Insurance (BFI) (2)
  3. Cooperatives (4)
  4. Education (2)
  5. Government (13)
  6. Health (2)
  7. Infrastructure (7)
  8. Manufacturing (26)
  9. Mining (2)
  10. Miscellaneous (4)
  11. Public Sector (14)
  12. Telecom and Software (1)
  13. Transportation and Logistics (7)
State
  1. Andhra Pradesh (2)
  2. Bihar (3)
  3. Gujarat (12)
  4. Kerala (1)
  5. Madhya Pradesh (1)
  6. Maharashtra (7)
  7. Uttar Pradesh (1)
  8. West Bengal (1)
Product Type
  1. Case (53)
  2. Exercise (4)
  3. Technical Note (5)

Search results for 'Project manage'

per page
  1. Bharat Construction Company Limited (A)

    Authors: Shukla, P R;

    Reference No: PROD0192(A) Pages: 15 Published on: 1, January, 1984

    Abstract: The case can be used to discuss the management control system in a new project. An existing MCS for a large construction company is described and management problems faced by the company in handling a new project are highlighted. The new MCS that can be suitable for the situation can ... More

  2. Demand for Hybrid Bajra Seed

    Authors: Desai, D K;

    Reference No: CMA0183 Pages: 9 Published on: 20, November, 1969

    Abstract: This case is prepared from the research project entitled "Management of production distribution of hybrid Bajra seed in Gujarat." This is used to teach the concepts of demand elasticities and also the methodology to conduct surveys for dem estimates. ... More

  3. Reinventing Project Management at Tata Steel (A): Caselet Implementaetion of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0273 Pages: 2 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in TATA STEEL becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  4. Reinventing Project Management at Tata Steel (A): Implementation of Cold Rolling Mill (CRM)

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(A) Pages: 13 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  5. Cyclone Hudhud at Rashtriya Ispat Nigam Ltd, Vishakhapatnam

    Authors: Sandhyavani, K.V Naidu; Taviti G.; Arunkumar M.; Dutta, Goutam;

    Reference No: PSG0130 Pages: 33 Published on: 27, February, 2019

    Abstract: This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and ... More

  6. Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (B)

    Authors: Dutta, Goutam;

    Reference No: PROD0327(B) Pages: 20 Published on: 22, March, 2021

    Abstract: A week after the first meeting, the Chief Engineer, Public Health Division, Patna, Bihar wanted to have a second meeting to discuss the development of a network diagram. In this meeting, he requested all the stakeholders to attend the meeting and discussed how the network diagram can be developed with ... More

  7. Reinventing Project Management at Tata Steel (B): Revamp of Blast Furnace F

    Authors: Tripathy, Arabinda; Seshadri, D V R;

    Reference No: PROD0280(B) Pages: 7 Published on: 16, July, 2004

    Abstract: The case series deals with the successful initiation of Tata Steel in various fields. This resulted in Tata Steel becoming lowest cost steel producer in the world. The case series documents the various initiations. ... More

  8. Pipavav Railway Corporation Limited (A)

    Authors: Raghuram, G; Len Varghese George; Nishant Thusoo; Satyam Shivam Sundarm;

    Reference No: CIPR0004(A) Pages: 36 Published on: 23, March, 2010

    Abstract: This case focuses on risk identification in the context of a railway Public Private Partnership (PPP) project. The perspective is that of a lender. The project was to provide broad gauge (BG) rail connectivity to Pipavav port from Surendranagar, over a distance of 265 kms. The case provides the salient features ... More

  9. Development of Chaloda Village

    Authors: Srivastava, U K; Rao, Sreenivas S;

    Reference No: CMA0524 Pages: 10 Published on: 1, January, 1980

    Abstract: Discusses the uncertainties involved in providing tubewells in Chaloda village as a part of the developmental activities of a voluntary agency. Though, formal sources are available for financing the project, the farmers are not organized in getting the finances and managing the project. For want of data of the risk ... More

  10. Marico Limited: Warehouse Automation and Technology Selection

    Authors: Roy, Debjit; Yadu, Bipin ;

    Reference No: CTL0005 Pages: 22 Published on: 27, December, 2024

    Abstract: The case demonstrates how warehousing automation projects are pitched, initiated and executed when the management is sceptical of the success of new technologies. In FY 2020–2021, Marico achieved a record-high turnover of USD 1.3 billion. The company’s future looked bright, and sales were expected to increase. The situation on the shop ... More

  11. Developing Urban Transport Infrastructure in Ahmedabad: The Bus Rapid Transit System (A)

    Authors: Gupta, Atul; Dabir, Bhushan; Patil, Sapana; Mahajan, Dilip; Swamy, Shivanand;

    Reference No: CIPR0001(A) Pages: 14 Published on: 1, December, 2006

    Abstract: The government has created an environment for rapid development to take place in infrastructure. However, managing the involvement of private partners as well as providing firm regulation requires institutions. Local governments at the city level have little experience in managing this process. This case uses the bus rapid transit system ... More

  12. Urabian Airbus Project

    Authors: Balakrishnan, K;

    Reference No: QM0111 Pages: 12 Published on: 1, January, 1976

    Abstract: Deals with the problems associated with the introduction of five widebody Airbuses to replace a fleet of Turbo Props and Caravelles. As it is essential to synchronize the publicity campaign with the formal introduction of the Airbus, the management wants to know when the five aircraft will be ready ... More

  13. The Soil Health Card Project

    Authors: Vijaya Sherry Chand; Ravi, Jayanti S;

    Reference No: RJMC0022 Pages: 18 Published on: 13, June, 2012

    Abstract: The Commissionerate of Higher Education had motivated 55 science colleges to take up the Soil Health Card Project, a project of the Agriculture Department, under which 740,000 soil samples were tested in 2010. In 2011, there was a delay in obtaining approvals. The Commissionerate took some remedial steps and is about to obtain an ... More

  14. Thana District Cooperative Fisheries Project (B)

    Authors: Varshneya, K L;

    Reference No: F&A0249 Pages: 28 Published on: 1, January, 1974

    Abstract: The general manager was considering what additional control information should be collected and what control practices adopted so that the venture would be successful, and conform to plans. He was concerned about the increasing outstanding balances in the current accounts for supplies and requisites to fishing boats.This case is ... More

Items 31 to 45 of 65

per page

My Cart

You have no items
in your shopping cart.