Reference No: F&A0227Pages: 32Published on: 1, January, 1970
Abstract: A development bank set up to assist small scale manufacturers finances for the first time a qualified scientist's project for the manufacture of dibasic calcium phosphate (DCP) of pharmaceutical and dentifrice grades. The project runs into difficulties due to environmental factors such as floods and power shortage, which upset the ... More
Reference No: PSG0084Pages: 11Published on: 24, October, 2002
Abstract: This case study discusses various issues in toll based BOT projects. L&T Transportation Infrastructure Limited (LTTIL), the BOT operator has been facing financial problems, experiencing a difficult time collecting tolls from the Athupalam Bridge segment of the Coimbatore Bypass project. Though LTTIL and the Government have been trying to ... More
Reference No: BP0144(D)Pages: 24Published on: 1, January, 1983
Abstract: Reviews the company's performance during a seven-year period--1974-75 to 1980-81. Voltas had resorted to certain operational strategies having significant financial implications: 1) it altered its method of calculating depreciation on its fixed assets; 2) it entered into foreign collaboration for its international operations; 3) it absorbed two of its affiliate companies with ... More
Reference No: CMA0219Pages: 9Published on: 2, September, 1970
Abstract: A leading bank in Western India gave a loan of Rs.2,50,000 to a farmer. The first installment due was not paid according to the schedule the farmer made a request to the branch manager not to insist for immediate repayment. This matter was put up by the Head Office before ... More
Reference No: F&A0184(B)Pages: 3Published on: 1, January, 1970
Abstract: Mr. Sahney, Vice President (Finance), has been considering what his recommendations to the President should be, regarding the sales manager's proposal, of relaxing the credit terms, to augment the sales of farm machinery, especially since the plant has been operating below capacity. The case brings out the contribution approach to ... More
Reference No: CMA0675TECPages: 29Published on: 1, January, 1989
Abstract: This note discusses the nature of follow-up exercises by NABARD for its refinance of rural development activities. It gives the proforma for various NABARD returns compiled at branch, district, and regional level by the concerned banks, and the back-up register maintained at branch level for collecting information on loans under ... More
Reference No: CMA0524Pages: 10Published on: 1, January, 1980
Abstract: Discusses the uncertainties involved in providing tubewells in Chaloda village as a part of the developmental activities of a voluntary agency. Though, formal sources are available for financing the project, the farmers are not organized in getting the finances and managing the project. For want of data of the risk ... More
Reference No: CMA0526Pages: 13Published on: 1, January, 1980
Abstract: Outlines a state government's attempt to obtain refinance for continuation of a development scheme. The role of AFC as consulting organization has been discussed in the case. ... More
Reference No: CIPR0008Pages: 16Published on: 20, October, 2010
Abstract: In February 2006, Engineers India Limited (EIL) which was hired by the Hindustan Petroleum Corporation Ltd (HPCL) had to submit their final report. The report had to evaluate whether a single point mooring or an additional jetty would be more viable for HPCL's increased crude import requirements through the Mumbai port. ... More
Reference No: F&A0349Pages: 3Published on: 1, January, 1981
Abstract: The basic elements of the control system initially envisaged by the company were 1) PERT/cost system to monitor project progress and related costs; 2) material and labour cost standards to form the basis of comparison with actuals; and 3) an overhead budget which identified the various manufacturing, finance, and administration overheads by ... More