  1. Capacity and its Measurement

    Authors: Korgaonker, M G;

    Reference No: PROD0162TEC Pages: 4 Published on: 1, January, 1980

    Abstract: This note deals with the capacity measurement of a production system. Various factors influencing capacity are highlighted, and their effects on capacity measurement are discussed. ... More

  2. Control of Foundry Defectives (I, II & III)

    Authors: Korgaonker, M G;

    Reference No: PROD0163 Pages: 4 Published on: 1, January, 1980

    Abstract: The case deals with statistical quality control of foundry defectives by attributes. Specifically, the first two parts of the case pose the problem of designing an appropriate control chart for control of foundry defectives, using identical sample sizes. The third part of the case deals with the development of a ... More

  3. Machines Are Down

    Authors: Korgaonker, M G;

    Reference No: PROD0164 Pages: 3 Published on: 1, January, 1980

    Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More

  4. Acceptance Sampling: An Application

    Authors: Narayanan, N; Korgaonker, M G; Kalro, A H;

    Reference No: PROD0165 Pages: 3 Published on: 1, January, 1980

    Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More

  5. Economic Sampling Plan

    Authors: Korgaonker, M G;

    Reference No: PROD0166TEC Pages: 1 Published on: 1, January, 1980

    Abstract: This problem deals with the methodology of finding a minimum cost acceptance-sampling plan where the relevant costs are the cost of inspection and the cost of undetected defectives. Sampling is by attributes. ... More

  6. The Cycling Lots

    Authors: Korgaonker, M G;

    Reference No: PROD0167 Pages: 2 Published on: 1, January, 1980

    Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More

  7. The Complex Line

    Authors: Korgaonker, M G;

    Reference No: PROD0168 Pages: 4 Published on: 1, January, 1980

    Abstract: Deals with the problem of balancing assembly lines under variable element times and seasonal, fluctuating demand requirements. ... More

  8. Company Standardization Activity at NEL

    Authors: Korgaonker, M G;

    Reference No: PROD0169TEC Pages: 10 Published on: 1, January, 1981

    Abstract: The case deals with the company standardization activity at NEL. Various aspects of standardization such as set up, coverage benefits from standardization, sources of information, etc. are covered. ... More

  9. Offloading Decision - A Case

    Authors: Korgaonker, M G;

    Reference No: PROD0170 Pages: 9 Published on: 1, January, 1981

    Abstract: This case deals with offloading decision in a heavy engineering type manufacturing organization. The case covers both the procedures as well as criteria used for the offloading decision. ... More

  10. Materials Requirement Planning

    Authors: Korgaonker, M G;

    Reference No: PROD0176TEC Pages: 14 Published on: 1, January, 1983

    Abstract: The note deals with materials requirement planning (MRP)??its significance, principal assumptions and prerequisites of the MRP system, and lot sizing techniques and advantages. Product structuring and other important aspects of the MRP are also considered. ... More

  11. Short Interval Scheduling

    Authors: Korgaonker, M G;

    Reference No: PROD0178TEC Pages: 13 Published on: 1, January, 1983

    Abstract: Deals with various aspects of short interval scheduling (SIS) such as significance and applications in various areas like production planning and control, fabrication and assembly work, maintenance, engineering work, clerical operations, and material handling. Management reporting in an SIS environment is also dealt with. ... More

  12. Quality Circles

    Authors: Korgaonker, M G;

    Reference No: PROD0179TEC Pages: 13 Published on: 1, January, 1983

    Abstract: Deals with the concept of quality circles (QCs). The historical evolution of QCs, basic philosophy, structure, techniques applicable for QC work, applications, and common misconceptions are discussed. The methodology for their implementation within an organization is spelt out and typical implementation problems are highlighted. Some illustrative examples drawn from Indian ... More

  13. Contract Management in Projects

    Authors: Korgaonker, M G;

    Reference No: PROD0209TEC Pages: 31 Published on: 1, January, 1991

    Abstract: This note deals with the contract management process in projects. The note covers the entire gamut of the contract cycle. First, the various ways of defining contract responsibility are considered. Next, it looks at typical contract payment systems and methodologies for making choice of the appropriate payment system. It then ... More

  14. Project Planning and Scheduling for Implementation

    Authors: Korgaonker, M G;

    Reference No: PROD0210TEC Pages: 25 Published on: 1, January, 1991

    Abstract: This note deals with planning and scheduling implementation of projects. It begins by considering the Work Breakdown Structure (WBS) of a project as a fundamental requirement for development of planning and scheduling systems. Various methods of structuring the WBS of projects are first discussed at length, including ways of establishing ... More

  15. Maintenance Scheduling of Railway Coaching Stock: A Case of Ahmedabad

    Authors: Korgaonker, M G; Raghuram, G;

    Reference No: PROD0214 Pages: 19 Published on: 1, January, 1992

    Abstract: This case describes the maintenance requirements of various passenger trains terminating and originating at Ahmedabad. Based on these requirements, a maintenance schedule must be drawn up, keeping in mind the availability of maintenance facilities. ... More

Items 31 to 45 of 46

per page

My Cart

You have no items
in your shopping cart.